. ICAO SARPs: Has ICAO been notified of non-compliance with SARPs where required by the Convention? . AIS: Have any inconsistencies/errors been found in AIP/Supplements to AIP e.g. outdated material or wrong co-ordinates. If so, list. . LoAs: . Have any errors been detected in LoAs, if so list these. . Do all parties to LoAs have the same version of the LoA? If not, note this. . Local ATC Instructions: Have any inconsistencies/errors been detected in these instructions? If so, list.
Outstanding Actions/Issues
Action Due date Responsible
Reports
REPORT TYPE DUE DATE RESPONSIBLE CONSULTATION PERIOD
DRAFT REPORT
REVIEW
FINAL REPORT
Terminal Airspace Design Guidelines - Part C
INTENTIONALLY BLANK
Terminal Airspace Design Guidelines - Part C
Attachment C.8-3
Checklist – Performance Criteria
C
h
e
c
k
l
i
s
t
:
P
E
R
F
O
R
M
A
N
C
E
C
R
I
T
E
R
I
A
(ref. Part , Ch.3)
ASSESSMENT AND MEASUREMENT (ref. Part C 3.2)
. Is the chosen Assessment methodology (qualitative vs. quantitative) the correct methodology for the required measurement? . Do the people that are assigned to the assessment have the suitable background and support tools to do the assessment? . Is the assessment done by people from the project team or by external parties? . Is the assessment done repetitive during the design process?
SAFETY CRITERIA (ref. Part C 3.3)
. What has been the motivation to decide on either relative or absolute measurement of safety? . What is the chosen frequency approach on safety assessment (phased vs. once-only) and why was this approach chosen? . What is the chosen support to substantiate the safety assessment; simulations (fast- real-time), analysis and/or expert judgement? . What is the “benchmark” used in the determination of safety criteria?
PERFORMANCE CRITERIA (ref. Part C 3.4, 3.5)
. Are the design objectives met? . Depending on the objectives were quality and or quantity measured in order to determine if the objectives are met? . Are there measurement tools used, that would normally be outside the scope of the design project, to measure if the objectives are met (e.g. noise modelling tools)?
Outstanding Actions/Issues
Action Due date Responsible
Reports
REPORT TYPE DUE DATE RESPONSIBLE CONSULTATION PERIOD
DRAFT REPORT
REVIEW
FINAL REPORT
Terminal Airspace Design Guidelines - Part C
INTENTIONALLY BLANK
Terminal Airspace Design Guidelines - Part C 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:EUROCONTROL MANUAL FOR AIRSPACE PLANNING 2(78)