Number of working days required for each identified Task/Activity 
Edition: 2.0 Released Issue Page C-8-5 Amendment 1 – 17/01/05


E. TASK ALLOCATION 
Task No:  Responsible Person/s  Due date (Draft Report)  Due Date (Final Report) 

 


Attachment C.8-1 Checklist – Writing the Reference Scenario W
WWR
RRI
IIT
TTI
IIN
NNG
GG T
TTH
HHE
EE R
RRE
EEF
FFE
EER
RRE
EEN
NNC
CCE
EE S
SSC
CCE
EEN
NNA
AAR
RRI
IIO
OO (
((r
rre
eef
ff.
.. P
PPa
aar
rrt
tt C
CC 2
22.
..2
22,
,, 2
22.
..3
33)
)) 1. Runways Which runways are in use? 2. Traffic Types and Distribution .
What is the quantity of the traffic in terms of Arrival, Departure and Transit Traffic in combination with different traffic types? .
What are the Traffic Mix in categories (H/M/L) and Navigation Capabilities (Conventional / NAV)? 3. Terminal Airspace .
What are the lateral dimensions of the Terminal Airspace? .
What are the Airspace Classifications in, and if deemed of interest, outside the Terminal Airspace? .
What is the Transition Altitude in the Terminal Airspace? .
Are there Airspace Reservations (military/VFR corridors/ recreational flying)? .
Are there Airspace Restrictions that have an impact on the Terminal Airspace? .
Are there Holding Areas and is there a Minimum Safe Altitude? .
Are there Approach procedures published and to what extent are they used? .
Are there Departure and Arrival procedures published? .
Are there Radar Vectoring Patterns & MRVA defined and/or published? 4. Traffic Management .
How is the airspace surrounding the TMA organised? Are there adjacent ACC Sectors, ACC Sectors above and/or adjacent Terminal Airspace(s) and what is their relation with the TMA? .
How is the Arrival Traffic managed? .
How is the Departure Traffic managed? .
How is the Transit Traffic managed? .
If applicable, how are Military, VRF and Recreational Traffic managed? 5. Technical Support Infrastructure Edition: 2.0 Released Issue Page C-8-7 Amendment 1 – 17/01/05 Terminal Airspace Design Guidelines - Part C
.
What are the System Capabilities and Availability for: Radar Data Processing, Flight Data Processing and HMI? .
What are the System Capabilities and Availability for Voice Communication Systems i.e. Radio and Phone? .
What are the System Capabilities and Availability for Navigation and Landing Aids? 
6. Weather and Terrain 
. What does the terrain in, and surrounding the TMA Look like? . What are the Weather patterns / thunderstorm activities? . What is the impact of low pressure on FL availability in Terminal airspace (Transition level)? 
7. Environmental Constraints 
. Are there Environmental Constraints in terms of Noise restrictions (time/location/level)? 

Outstanding Actions/Issues
Action  Due date  Responsible 

 

 

 

 


Reports
REPORT TYPE  DUE DATE  RESPONSIBLE  CONSULTATION PERIOD 
DRAFT REPORT 
REVIEW 
FINAL REPORT 

Terminal Airspace Design Guidelines - Part C
Attachment C.8-2
Checklist - Critical Review of Reference Scenario
Note 1: The statement of the (Pseudo) Reference Scenario (at A, above) forms the basis of the Critical Review.
Note 2: The first two questions as regards every item of the Reference Scenario could be:
. Does this {element} work well?
. What doesn’t work (about this particular {element})? Note 3: Project design objectives as well as the Design Guidelines for Routes, Holds, structures and Sectors can be used as the benchmark for the Critical Review i.e. to decide whether a
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:EUROCONTROL MANUAL FOR AIRSPACE PLANNING 2(75)