• 热门标签
时间:2011-08-28 16:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Made up of the Reference Scenario, the Design Concept and Design Guidelines, the efficiency of the Design Methodology depends upon following a well planned step-by-step process undertaken in collaboration with interested parties with a view to ensuring the safety of operations within the airspace being designed.
To the above ends, qualitative analysis is of particular importance to the entire Design Methodology at each part of the process.
Edition: 2.0 Released Issue Page C-1-7 Amendment 1 – 17/01/05
T
e
r
m
i
n
a
l
A
i
r
s
p
a
c
e
D
e
s
i
g
n
G
u
i
d
e
l
i
n
e
s
-
P
a
r
t
C

INTENTIONALLY BLANK

T
e
r
m
i
n
a
l
A
i
r
s
p
a
c
e
D
e
s
i
g
n
G
u
i
d
e
l
i
n
e
s
-
P
a
r
t
C

Attachment C.1-1
Document References of Relevance to Terminal Airspace Design
Part C 
Chapter  Subject  Document Reference 
3  Safety Assessment  How to undertake - Doc. 9689 
Need For- Annex 11  Chapter2 
Need For- Doc. 4444  Chapter 2 
Need for & How to undertake - ESARR 3 & 4 
4  Enablers, Constraints  Environmental Protection  Annex 16 
RNP - Manual of  Doc. 9613 
LoA - Common Format  EAPM  Section 6 
Radar Surveillance … Major Terminal Airspace  E-Ref. 1 (below)  Chapter 5 
5  Arrival/Departure Routes  Design Criteria – Conventional/RNAV  Doc. 8168  Vol. II 
Design Criteria – RNAV  E-Ref. 2 (below) 
Helicopter Operations  Doc. 9426  Part II, Section 4 
IFR/VFR - Mixed Operations  Doc. 9426  Part II, Section 4 
Instrument Flight Procedures Construction  Doc. 9368 
Lateral Limits  Annex 4 
Level Restrictions - (~Vertical Limits)  Annex 4 
Mixed IFR/VFR Operations  Doc. 9426  Part II, Section 4 
Publication  Annex 4 
Publication  Annex 15 
SID/STAR - Establishment of  Doc. 9426  Part I, Section 2 
SID/STAR- Identification of  Annex 11  Appendix 3 
Significant Points - Establishment & Identification  Annex 11  Appendix 2 
Waypoint Naming Convention  E-Ref. 3 (below) 
Routes - Other  ATS Routes (RNAV) -Establishment of  Annex 11  Attachment B 
En Route ATS Route Design Guidelines  EAPM  Section 4 
Holding  Design Criteria -Conventional/RNAV  Doc. 8168  Vol II 
Design Criteria -RNAV  E-Ref. 3 (below) 
Holding - Establishment of  Doc. 9426  Part I, Section 2 
Template  Doc. 9371 
6  Terminal Airspace  General Terminal Airspace Information  Doc. 9426  Part I, Section 2 
Publication  Annex 15  Chapter 3 
Vertical/Lateral Limits  Annex 11  Chapter 2 
Airspace - Other  Airspace Restrictions & Reservations  EAPM  Section 3 
General Airspace Guidelines  EAPM  Section 1 
En Route Design Guidelines  EAPM  Section 4 
Sectorisation  Capacity Estimation  Doc. 9426  Part II, Section 1 
Capacity Estimation  Doc. 4444  Chapter 3 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:EUROCONTROL MANUAL FOR AIRSPACE PLANNING 2(11)