TUBE CUTOUT LENGTHS IN INCHES
Tubing Repair with Unions - Short Damage
Figure 805 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51
ALL ú
ú 03 Page 854
ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
L08675
A 737-300/400/500MAINTENANCE MANUAL
MS FLARELESS
NOTE: REFER TO FIG. 810 (SHEET 1) FOR THE LENGTHS L1 AND L2.
Tubing Repair by End Replacement
Figure 806
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51
ALL ú ú 03 Page 855 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
L09194
A 737-300/400/500MAINTENANCE MANUAL
TUBE CUTOUT LENGTH TO USE
DAMAGED BACU24AB UNION
CUTOUT LENGTH A FOR REPLACING
BACU24AB UNION WITH MS21924 BULKHEAD UNION AND A ROLLER SWAGED BACS13BX SLEEVE
A
NOTE: REFER TO FIG. 808 FOR THE LENGTHS A,B AND C. COUPLING NUTS NOT SHOWN.
Tube Cutout Lengths for
Replacement of Damaged BACU24AB Swage Unions
Figure 807 (Sheet 1)
L09198
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51
ALL ú ú 03 Page 856 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
MS21924 OR
EQUIVALENT
UNION AND A PRESET BACS13AP SLEEVE
Tube Cutout Lengths for
Replacement of Damaged BACU24AB Swage Unions
Figure 807 (Sheet 2)
L09213
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51
ALL ú ú 03 Page 857 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
Repair Method: You need to replace a damqged BACu24AB swage union. You will cut out the fitting and
replace it with a BACS13BX or BACS13AP sleeve, a coupling nut and MS21924 flareless
bulkhead union of the same or equivalent material as the union you are replacing.
Check Fig. 802 for sleeve/tube material limitations.
To make the repair (Refer to Fig. 807):
Step 1: Cut the tube adjacent to the damaged union - to dimension A, B, or C depending on the sleeve and sleeve installation method you plane to use.
Step 2: Slide a flareless coupling nut on the tube. Follow the procedures for presetting a BACS13AP sleeve or swaging a BSCS13BX sleeve to the tube end.
Step 3: Install the MS21924 flareless bulkhead union between the two tube ends and tighten the nuts.
Procedure to Replace BACU24AB Union
Figure 808
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51
ALL ú ú 03 Page 858 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
L09216
A 737-300/400/500MAINTENANCE MANUAL
NOTE: REFER TO FIG. 810 FOR THE LENGTHS L1 AND L2.
Tubing Repair by Section Replacement
Straight or Bend - Extensive Damage
Figure 809
L09306
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-10-51 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 STANDARD PRACTICES(62)