• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-10 16:10来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

• Quality Control and Safety Management System requirement
– Provide for method of authorizing contract (3 rd. party) aircraft
ground deicing provider to provide deicing service
– Provide for use of Holdover/Allowance Times by small air
carrier operators
Federal Aviation 23 23
Administration
FAA Icing Program Update
September 26, 2007
The Takeoff and Landing Certification
and Operational Performance
Rulemaking Project (Contaminated
Runway Performance)
• Aviation Rulemaking Committee (ARC)
– Order should be signed soon and published in Federal Register
• Three Prong Approach
– Aircraft Certification
• Require contaminated runway takeoff and landing performance data in the
approved section of flight manual
– Air Carrier Operations
• Require assessment of landing distance at time of arrival, and before
departure considering actual runway surface and metrological conditions
– Airports
• Require accurate, timely, standardized reporting of runway surface
conditions
• Establish minimum runway surface condition standards for flight operations
– Research into better ways of providing flightcrews more accurate anticipated
aircraft braking capability
Federal Aviation 24 24
Administration
FAA Icing Program Update
September 26, 2007
Questions
?
Federal Aviation 25 25
Administration
FAA Icing Program Update
September 26, 2007
Thank You
YOU Have Been a Great Audience!
1
[Federal Register: December 31, 2008 (Volume 73, Number 251)]
[Rules and Regulations]
[Page 80296-80297]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31de08-2]
––––––––––––––––––––––––––––––––––
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2008-1353; Directorate Identifier 2008-NE-46-AD; Amendment 39-15779;
AD 2009-01-01]
RIN 2120-AA64
Airworthiness Directives; CFM International, S. A. CFM56-5B Series Turbofan Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule; request for comments.
––––––––––––––––––––––––––––––––––
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for CFM International, S. A.
CFM56-5B series turbofan engines. This AD requires reviewing exhaust gas temperature (EGT)
monitoring records to determine EGT deterioration margin, and for airplanes where both engines
have greater than 80° centigrade (C) deterioration of EGT margin, borescope-inspecting the highpressure
compressor (HPC) of both engines. This AD also requires removing from service any engine
that does not pass the borescope inspection, and if both engines pass, removing and replacing one of
the engines with an engine that has 80 °C or less deterioration of EGT margin. This AD also requires
continuous monitoring of EGT margin on engines in service, to prevent two engines on an airplane
from having greater than 80 °C of deterioration of EGT margin. This AD results from an Airbus
A321 airplane powered by CFM56-5B1/P turbofan engines experiencing HPC stalls during climb out
after takeoff. We are issuing this AD to prevent HPC stalls, which could prevent continued safe flight
or landing.
DATES: This AD becomes effective December 31, 2008.
We must receive any comments on this AD by March 2, 2009.
ADDRESSES: Use one of the following addresses to comment on this AD:
• Federal eRulemaking Portal: Go to http://www.regulations.gov and follow the instructions for
sending your comments electronically.
• Mail: U.S. Docket Management Facility, Department of Transportation, 1200 New Jersey
Avenue, SE., West Building, Ground Floor, Room W12-140, Washington, DC 20590-0001.
• Hand Delivery: Deliver to Mail address above between 9 a.m. and 5 p.m., Monday through
Friday, except Federal holidays.
• Fax: (202) 493-2251.
2
FOR FURTHER INFORMATION CONTACT: Stephen K. Sheely, Aerospace Engineer, Engine
Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park,
Burlington, MA 01803; e-mail: stephen.k.sheely@faa.gov; telephone (781) 238-7750; fax (781) 238-
7199.
SUPPLEMENTARY INFORMATION: On December 15, 2008, an Airbus A321 airplane powered
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料1(150)