• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2011-04-23 10:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Aft Fuel Shroud Drain Mast......................................... CLEAR, NO DRIPS
Conditioned Air Ground Connection Door....................................SECURE
Elevator Hydraulic Accumulator Access........................................SECURE

Right Engine
Engine Pylon Ram Air Vent............................................................... CLEAR
Engine Oil and Starter Valve Access Doors ...................................SECURE
Engine Inlet ......................................................................................... CLEAR
Bullet & PT2 Probe ........................................................................... CHECK
Engine Cowling Latches (4).............................................................SECURE
Nacelle Fairing Doors .........................................CLOSED AND LATCHED
CSD Oil Access Door........................................................................SECURE
Nacelle Strake..................................................................................... CHECK
Leakage Check ............................................................................... NO DRIPS
Engine Exhaust ................................................................................... CLEAR
Thrust Reverser ...............................................................................STOWED
APU Exhaust Duct Cooling Inlet.......................................................CLEAR
Air Conditioning Heat Exchanger Outlet.........................................CLEAR
APU Exhaust Outlet ........................................................................... CLEAR

Empennage
Stab Trim Motor Access Cover .........................CLOSED AND LATCHED

(Top of Fin Fairing on Vertical Stabilizer) Rudder Restrictor Pitot Tube......................................COVER REMOVED Elevator, Stabilizer, Rudder, and Tabs............................................ CHECK Static Dischargers .............................................................................. CHECK
Tail Cone Section
Tail Cone ...........................................................................................SECURE

Static Discharger................................................................................ CHECK
Tail Cone Access Panel...................................................................... CHECK
Tail Cone External Release.............................................................STOWED

Left Aft Fuselage
Tail Compartment Access Door............................................AS REQUIRED
APU Fire Panel ...................................................CLOSED AND LATCHED
Pneumatic Air Ground Connection Door.......................................SECURE
Stairway Control Access Door.........................................................SECURE
Tail Bumper and Strike Indicator........................................HORIZONTAL
APU Access Doors...............................................CLOSED AND LATCHED
Aft Fuel Shroud Drain Mast......................................... CLEAR, NO DRIPS
Tail Compartment Temperature Vent..............................................CLEAR
Thrust Reverser Control Valve Access Door.............................. LATCHED
Galley Drain Mast............................................................................... CLEAR
Aft Lavatory Service Door........................................ CLOSED, NO LEAKS
Cabin Pressure Outlet Assembly ..................................CLEAR AND OPEN
Aft Service Door.....................................................................AS REQUIRED

Left Main Gear and Wheel Well
Inspect all items as listed under Right Main Gear and Wheel Well.

Left Engine
Inspect all items as listed under Right Engine.

Left Wing
Inspect all items as listed under Right Wing with the exception of Fueling Panels.
Left Forward Fuselage
Brake Cooling Inlet............................................................................. CLEAR
Wing Leading Edge Floodlight......................................................... CHECK
Static Port Cluster .............................................................................. CLEAR
Potable Water Service Panel...............................CHECK, DOOR SECURE
Ground Floodlight ............................................................................. CHECK
Alternate Static Port...........................................................................CLEAR
Underside of Fuselage........................................................................ CHECK
Cabin Pressure Relief Valves (2) ....................................................... CLEAR
Cabin Pressure Relief Valve Static Ports (2)....................................CLEAR
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:MD-80 Flight Manual 麦道80飞行手册 1(124)