(4)
Remove the antenna cable connector from the antenna.
S 034-005
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
34-55-11
ALL ú ú 01 Page 401 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
DME Antenna Installation/Location
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
34-55-11
ALL ú ú 01 Page 402 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 024-006
(5) Remove the antenna and O-ring assembly.
TASK 34-55-11-424-007
3. Install the DME Antenna (Fig. 401)_______________________
A. Equipment
(1)
Sealing Gun - Six inch cartridge, Senco Research, or equivalent (Not required for material supplied in tubes).
(2)
Resistance measuring bridge or ohmmeter that
can measure 0.001 ohm.
(3)
Aerodynamic smoother cutting tool - hardwood or plastic.
(4)
Varnish brush - 1 to 2 inches.
(5)
Spatula
B. Consumable Materials
(1)
Sealing Compound - BMS 5-95, Class B-1/2 (AMM 20-30-11/201).
(2)
Accelerator - as indicated on the sealing compound container (AMM 20-30-11/201).
(3)
Aliophatic Naptha - TT-N-95, or equivalent (AMM 20-30-31/201).
(4)
Anticorrosion compound - BMS 3-23 (AMM 20-30-41/207).
C. References
(1)
AMM 24-22-00/201, Manual Control (Apply Power)
(2)
AMM 34-55-00/501, DME System - Adjustment/Test (AIRPLANES WITHOUT EFIS)
(3)
AMM 34-55-02/501, DME System - Adjustment/Test (AIRPLANES WITH EFIS)
(4)
SRM 51-20-01
D. Procedure
S 864-049
(1)
Make sure the DME-1 and DME-2 circuit breakers on the P18 and P6 circuit breaker panels are open with DO-NOT-CLOSE tags attahed.
S 164-008
(2)
Remove the aerodynamic smoother from the antenna base and the mounting area with the cutting tool.
S 164-009
(3)
Remove the grease, oil, dirt, and chips from the antenna base and the mounting area.
S 164-010
(4)
Apply clean aliphatic naptha with the varnish brush to the antenna base and mounting area (AMM 20-30-31/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
34-55-11
ALL ú ú 02 Page 403 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(5) S 164-011Remove the aliphatic naptha with a clean cloth.
(6) S 914-012Apply a layer of corrosion preventive compound (SRM 51-20-01).
(7) S 434-013Install an O-ring on the new antenna.
(8) S 434-014Connect the antenna cable connector to the antenna (Fig. 401).
(9) S 424-015Put the antenna in its position and install all but one of the screws.
S 764-016
(10) Do an electrical bonding test between the antenna base and airplane skin, as follows:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 4(37)