(9) If the fault continues, replace the SAFETY VALVE-NLG DOOR CLOSING (2629GM), (Ref. AMM TASK 32-31-19-000-001) and (Ref. AMM TASK 32-31-19-400-001).
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page A231
 Aug 01/05R
 CES  TASK 32-31-00-810-860
 MLG Door (LH) Does Not Close Fully
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
 1. Possible Causes
_______________
 - UPLOCK ASSY-MLG DOOR, L (2521GM)
- ACTG CYL-MLG DOOR, L (2523GM)
- MLG (LH) doors operating mechanism
- MLG (LH) door uplock units and pins
- MLG (LH) forward and aft fitting
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 32-31-00-200-001 Detailed Inspection of Gear Uplock and Door Uplock Units and Pins AMM 32-31-00-720-002 Functional Test of the Normal Extension and
 Retraction of the Landing Gear AMM 32-31-33-000-001 Removal of the MLG Door Uplock 2521GM (2520GM) AMM 32-31-33-400-002 Installation of the MLG Door Uplock 2521GM (2520GM) AMM 32-31-35-000-001 Removal of the MLG Door Actuating-Cylinder 2523GM
 (2522GM) AMM 32-31-35-400-001 Installation of the MLG Door Actuating-Cylinder 2523GM (2522GM) AMM 52-81-00-200-001 Detailed Visual Inspection of Main Landing Gear Door Forward and Aft Fitting
 3. Fault Confirmation
__________________
 A. Procedure
 (1) Do a check of the post flight report. If there is LGCIU 1 and 2 FAULT ECAM messages and related MLG (LH) door-closed target-position CFDS messages, do the Fault Isolation procedure.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page A232
 Aug 01/05R CES
 4. Fault Isolation
_______________
 A. Procedure
 NOTE : The procedure that follows, gives the information necessary to
____ identify mechanical faults related to the MLG (LH) door.
 (1) Do a detailed inspection of the MLG (LH) doors operating mechanism . Inspect the components for:
- security of attachment
- damage
 - corrosion
 - oil leaks.
 (2) Do the detailed visual inspection of the MLG (LH) door uplock units and pins (Ref. AMM TASK 32-31-00-200-001).
(3) Do the detailed visual inspection of the MLG (LH) forward and aft fitting (Ref. AMM TASK 52-81-00-200-001).
(4) Correct any fault found.
(5) If the fault continues, replace the UPLOCK ASSY-MLG DOOR, L (2521GM) (Ref. AMM TASK 32-31-33-000-001) (Ref. AMM TASK 32-31-33-400-002).
(6) Do the functional test of the normal extension and retraction of the landing gear (Ref. AMM TASK 32-31-00-720-002).
(7) If the fault continues, the MLG door (LH) is slow to operate or the fault continues after the subsequent flight, replace the ACTG CYL-MLG DOOR, L (2523GM) (Ref. AMM TASK 32-31-35-000-001) (Ref. AMM TASK 32-31-35-400-001).
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page A233
 Aug 01/05R
 CES  TASK 32-31-00-810-861
 MLG Door (RH) Does Not Close Fully
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
 1. Possible Causes
_______________
 - UPLOCK ASSY-MLG DOOR, R (2520GM)
- ACTG CYL-MLG DOOR, R (2522GM)
- MLG (RH) doors operating mechanism
- MLG (RH) door uplock units and pins 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 起落架 LANDING GEAR 1(52)