- if the functional test is not OK, do the next step.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page 216
 May 01/05R
 CES
 (2) Do the operational test of the L/G safety valve (Ref. AMM TASK 32-31-00-710-008):
 - if the operational test is OK, do the fault isolation procedure in Para. 4.A.(6)
- if the operational test is not OK, do the fault isolation procedure in Para. 4.A.(1).
 4. Fault Isolation
_______________
 A. Procedure
 (1) At the SAFETY VALVE-L/G SYS ISOLATION (49GA), release the electrical connector 49GA-A. (Ref. Fig. 201/TASK 32-31-00-991-010)
(2) Do a check for 28VDC at the free end of connector 49GA-A (Ref. ASM 32-31/07):
- if 28VDC is available, do step (5)
- if 28VDC is not available, connect the connector 49GA-A and do the next step.
(3) Replace the RELAY-HYDRAULIC CONTROL (48GA).
 (a) Do the part of the operational test in Para. 3.A.(2) that does a check of the operation of the MLG doors (Ref. AMM TASK 32-31-00-710-008):
 NOTE : To make sure that the hydraulic control relay is operating
____ correctly it is not necessary to do the check at 260 KTS.
 - if the fault continues, do the next step.
 (4) Do a check and repair as necessary the aircraft wiring (Ref. ASM 32-31/07):
 - if the fault continues, do the next step.
 (a) Do the part of the operational test in Para. 3.A.(2) that does a check of the operation of the MLG doors (Ref. AMM TASK 32-31-00-710-008):
 - if the fault continues, do the next step.
(5) Replace the SAFETY VALVE-L/G SYS ISOLATION (49GA) (Ref. AMM TASK 32-31-17-000-001) (Ref. AMM TASK 32-31-17-400-001):
- if the fault continues, do the next step.
(6) Replace the SEL VALVE-L/G (40GA) (Ref. AMM TASK 32-31-12-000-001) and (Ref. AMM TASK 32-31-12-400-001).
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page 217
 May 01/05R
 CES
 L/G Solenoid Safety Valve 49GA location
 Figure 201/TASK 32-31-00-991-010
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page 218
 May 01/05R CES
 5. Close-up
________
 A. Remove the ground support and maintenance equipment, the special and standard tools and all other items.
 B. Put the aircraft back to its initial configuration.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page 219
 May 01/05R
 CES
TASK 32-31-00-810-809
 L/G Selector Lever Deselection.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 - THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
 1. Possible Causes
_______________
 - LGCIU-1 (5GA1)
- LGCIU-2 (5GA2)
- LEVER-L/G NORM CTL (6GA)
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
ASM 323105S01 ASM 323106S01 AMM 32-31-00-710-002 Operational Test of the Landing Gear Doors AMM 32-31-11-000-001 Removal of the Landing Gear Normal Control lever
 (6GA) AMM 32-31-11-400-001 Installation of the Landing Gear Normal Control Lever
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 起落架 LANDING GEAR 1(10)