____ R system. 
R (b) On the ECAM wheel page the three rear green triangles will change R to amber XX.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page A210
 Aug 01/05 CESR (c) Use an applicable tool to move the MLG uplocks 2509GM and 2510GM R and the NLG uplock 2530GM to the closed and locked position.
R WARNING : DO NOT PUT YOUR FINGERS IN THE UPLOCK MECHANISM. THIS
_______ R IS DANGEROUS. 
R (d) On the ECAM wheel page the forward three green triangles should R be change to amber XX. R - if there is a remaining triangle shown green, replace the R applicable proximity sensor as follows: R R - for the NLG uplock proximity sensor 12GA (Ref. AMM TASK 32-31-R 73-000-005) and (Ref. AMM TASK 32-31-73-400-005) R R - for the MLG uplocks proximity sensors 8GA and 9GA (Ref. AMM R TASK 32-31-73-000-001) and (Ref. AMM TASK 32-31-73-400-001). R 
R (2) For proximity sensors PROX SNSR-R L/G UPLK, SYS 2 (10GA), PROX SNSR-L R L/G UPLK, SYS 2 (11GA) and PROX SNSR-NLG UPLK, SYS 2 (13GA). 
R (a) Remove the safety clip and the tag and close the circuit breaker R 2GA. 
R (b) Open safety and tag the circuit breaker/s for LGCIU 1. 
R NOTE : This makes sure that the LGCIU 2 has control of the L/G.
____ 
R (c) On the ECAM wheel page, the three rear green triangles will R change to amber XX. 
R (d) On the ECAM wheel page the forward three green triangles should R change to amber XX. R - If there is a remaining green triangle shown, replace the R applicable proximity sensor as follows: R R - for the NLG uplock proximity sensor 13GA (Ref. AMM TASK 32-31-R 73-000-005) and (Ref. AMM TASK 32-31-73-400-005). R R - for the MLG uplocks proximity sensors 10GA and 11GA (Ref. AMM R TASK 32-31-73-000-001) and (Ref. AMM TASK 32-31-73-400-001) R 
R NOTE : To do a check of a L/G proximity sensor before removal
____ R (Ref. page block 301). 
R (3) After a proximity sensor has been replaced, to test the proximity R sensor, do the applicable part of the fault isolation again (Ref. R Para 4.). 
R (a) Pressurize the green hydraulic system to open and unlock the L/G R uplocks (Ref. AMM TASK 29-10-00-863-001).
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞32-31-00∞∞∞∞∞∞∞∞∞∞Page A211
 Aug 01/05 CES
R  (b) Depressurize the green hydraulic system (Ref. AMM TASK 29-10-00- 
R  864-001).  
R  (4) If the fault continues, the uplock proximity sensor to target  
R  clearance is at fault. Replace the applicable uplock:  
R  - For MLG UPLOCK ASSY-MLG, L (2509GM) or UPLOCK ASSY-MLG, R (2510GM),  
R  (Ref. AMM TASK 32-31-44-000-001) and (Ref. AMM TASK 32-31-44-400- 
R  001)  
R  - For NLG UPLOCK ASSY-NLG (2530GM). , (Ref. AMM TASK 32-31-21-000- 
R  001) and (Ref. AMM TASK 32-31-21-400-001).  
R  (5) After an uplock has been replaced, to test the uplock, do the  
R  applicable part of the fault isolation again (Ref. Para 4.).
 TASK 32-31-00-810-849
 L/G Failure Of The L/G Safety Valve Power Interrupt Test.
1. Possible Causes 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 起落架 LANDING GEAR 1(44)