R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
5. Close-up
________
Subtask 46-21-00-860-053
A. Put the aircraft back to its initial configuration.
(1) On the MCDU 1, fully decrease the brightness of the MCDU screen (display off).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
Subtask 46-21-00-862-050
B. De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
R 1EFF : 106-149, 151-199, 201-299, 301-399, 1 46-21-00Page 541 1401-499, 1Aug 01/05 1 1 1CES 1
TASK 46-21-00-740-001
BITE Test of the ATIMS
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-003 Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page 31-32-00-860-013 Procedure to Get Access to the SYSTEM
REPORT/TEST/INFO SYS Page
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
Post SB 46-1013 For A/C 151-156,201-209,
46-21-00-991-007 Fig. 505
R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
3. Job Set-up
__________
Subtask 46-21-00-861-072
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
R 1EFF : 106-149, 151-199, 201-299, 301-399, 1 46-21-00Page 542 1401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C 106-149, 155-199, 208-299, 301-399, 401-499,
Subtask 46-21-00-860-050-A
B. Aircraft Maintenance Configuration
(1)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(2)
Do the procedure to get the SYSTEM REPORT/TEST/INFO SYS page (Ref. TASK 31-32-00-860-013).
**ON A/C 151-154, 201-207,
Subtask 46-21-00-860-050
B. Aircraft Maintenance Configuration
(1)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(2)
Do the procedure to get access to the SYSTEM REPORT/TEST/COM page (Ref. TASK 31-32-00-860-003).
R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
Subtask 46-21-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AUTO FLT/MCDU/1 11CA1 B01 49VU SDAC/1/SPLY 3WV F04 49VU FWS/FWC1/SPLY 3WW F01 121VU CFDS/CFDIU/SPLY 2TW J18 121VU ATSU 1 3TX1 L16 121VU ATSU 1/SWTG 5TX1 L15 121VU COM NAV/VHF/3 2RC3 L05 121VU AUTO FLT/MCDU/2 11CA2 N20 121VU EIS/FWC2/SPLY 2WW Q07
R 1EFF : 106-149, 151-199, 201-299, 301-399, 1 46-21-00Page 543 1401-499, 1Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 151-199, 201-210,
121VU AIDS/DMU 4TV K15 R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
4. Procedure
_________
**ON A/C 151-154, 201-207,
Subtask 46-21-00-740-050
A. BITE Test of the ATIMS
NOTE : During the test, obey the instructions on the MCDU.
____
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 信息系统 INFORMATION SYSTEMS(54)