(10) Attach the harness 16QT1(16QT2) to the fuel probe 39QT1(39QT2) body and the structure with the cable-ties (1).
Subtask 28-42-43-420-082
C. Continue with the Installation Procedure
(1)
Put the cable for the sensor 19QJ1(19QJ2) in the P clip (3).
(2)
Use the bolt of the sensor 19QJ1(19QJ2) to install the P clip (3) (Ref. TASK 28-46-15-400-009).
(3)
Put the cable for the sensor 19QJ1(19QJ2) in position. (Ref. Fig. 408/TASK 28-42-43-991-008)
(4)
Make a coil of the unwanted cable and attach the harness 16QT1(16QT2) to the structure with the cable-ties (1).
(5)
Get access through the opening 540KB(640KB) to RIB15.
(6)
Remove the blanking cap and connect the plug connector (33) to the connector 4046VC1(4046VC2) (34). (Ref. Fig. 405/TASK 28-42-43-991-009)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page A400 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-42-43-865-061
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1QP, 4QP, 1QT, 2QT, 8QT, 1QJ.
Subtask 28-42-43-740-054
E. Test
(1)
Do a status report (BITE) of the fuel-quantity indicating system (Ref. TASK 28-42-00-740-001).
(2)
Do a functional (BITE) test of the fuel-tank level-sensing system (Ref. TASK 28-46-00-740-001).
5. Close-up
________ Subtask 28-42-43-410-059
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable access panels (Ref. TASK 57-27-11-400-002):
-
FOR 16QT1
install 540KB, 540LB, 540MB, 540QB
-
FOR 16QT2
install 640KB, 640LB, 640MB, 640QB.
Subtask 28-42-43-650-057
B. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).
Subtask 28-42-43-942-056
C. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the safety barriers.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page A401 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
(3)
Remove the warning notice(s).
(4)
Remove the access platform(s).
(5)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page A402 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C 301-399,
TASK 28-42-43-000-005
Removal of the Wing Tank Harness 57QT(58QT), 63QT(64QT)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adhesive tape No specific adjustable access platform No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific string FOR FIN 57QT, 58QT 98D57004013000 1 HOOK-COVER (RIB 2 SURGE DOORS) 98D57004014000 1 HOOK-COVER (RIB2-SURGE DOORS) FOR FIN 63QT, 64QT 98D57004014000 1 HOOK-COVER (RIB2-SURGE DOORS)
R 1EFF : 301-399, 1 28-42-43Page A403 1 1 Feb 01/05 1 1 1CES 1 B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-10-00-910-001 28-10-00-910-002 28-25-00-650-001 28-25-00-650-003
28-42-15-000-005
28-46-15-000-001 28-46-17-000-001 28-46-19-000-001 57-27-11-000-001
57-27-11-000-002
28-42-43-991-014 28-42-43-991-015 28-42-43-991-016
R **ON A/C 301-302,
28-42-43-991-017
R **ON A/C 303-399,
R 28-42-43-991-017-A
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油6(8)