R  4. Procedure_________ 
R  (Ref. Fig. 404/TASK 28-43-21-991-004) 
R  Subtask 28-43-21-420-059 
R  A. Preparation for Installation 
R  (1) Clean the component interface and/or the adjacent area with a 
R  MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS 
R  (Material No. 11-026). 
R  (2) Make sure that the parts retained from the removed component are 
R  clean and in the correct condition. 
R  (3) Do an inspection of the component interface and/or the adjacent area. 
R  (4) Lubricate with FUELS (Material No. 01-001) or COMMON GREASE (Material 
R  No. 04-012): 
R  - FOR 56QM, 57QM 
R  the new O-ring (4) and the new O-ring (5) 
R  - FOR 58QM, 60QM, 62QM, 208QM, 200QM 
R  the new O-ring (4) and the new O-ring (5) 
R  - FOR 59QM, 61QM, 63QM, 209QM, 201QM 
R  the new O-ring (4) and the new O-ring (5). 
R  Subtask 28-43-21-420-055 
R  B. Installation of the Magnetic-Level-Indicator Assembly 
R  (1) Install the new O-ring (5) on the base (2). 
R  NOTE : You must bond one of the bolts (6) (Ref. TASK 28-43-21-991-____ 
R  002) (Ref. TASK 20-28-00-912-002). 
R  (2) Apply a thin layer of SEALANTS (Material No. 09-007) to the interface 
R  of the bolts (6).

 

R  (3) Install the bolts (6), the new O-ring (4), the MLI (7) and the nuts 
R  (3). 
R  (4) Apply a thin layer of SEALANTS (Material No. 09-001) over the nuts 
R  (3) and the ends of the bolts (6). 
R  (5) Make sure the float (1) moves smoothly along the complete length of 
R  the MLI tube. 
R  Subtask 28-43-21-410-051 
R  C. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) FOR 56QM 
R  Remove the HOOK-COVER (RIB2-SURGE DOORS) and carefully close the 
R  surge door 540BZ. 

R  (3) FOR 57QM 
R  Remove the HOOK-COVER (RIB2-SURGE DOORS) and carefully close the 
R  surge door 640BZ. 
R  (4) Install the applicable access panel (Ref. TASK 57-27-11-400-001) or 
R  (Ref. TASK 57-27-11-400-002): 
R  - FOR 56QM 
R  install 540AB 
R  - FOR 57QM 
R  install 640AB 
R  - FOR 58QM 
R  install 540BB 
R  - FOR 59QM 
R  install 640BB 
R  - FOR 60QM 
R  install 540DB 
R  - FOR 61QM 
R  install 640DB 
R  - FOR 62QM 
R  install 540GB 
R  - FOR 63QM 
R  install 640GB 
R  - FOR 208QM 
R  install 540KB 
R  - FOR 209QM 
R  install 640KB

 

R  - FOR 200QM 
R  install 540NB 
R  - FOR 201QM 
R  install 640NB. 
R  Subtask 28-43-21-650-053 
R  D. Fuel Configuration 
R  (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-
R  003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001). 
R  Subtask 28-43-21-790-051 
R  E. Test 
R  (1) Make sure that the fuel does not leak from the MLI assembly (7). 
R  5. Close-up________ 
R  Subtask 28-43-21-942-053 
R  A. Removal of Equipment 
R  (1) Remove the safety barriers. 
R  (2) Remove the access platform(s). 
R  (3) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items.

 

__________________________________________________________________________ REMOVAL/INSTALLATION
____________________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 TASK 28-43-22-000-001 Removal of the Magnetic-Level-Indicator Rod 112QM (113QM) WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
 