1EFF : 303-399, 1 28-42-43Page A425 1 1 Feb 01/05 1 1 1CES 1 1EFF : 301-399, 1 28-42-43Page A426 1 1 Feb 01/05 1 1 1CES 1 B. Consumable Materials
R **ON A/C 301-399,
TASK 28-42-43-400-005
Installation of the Wing Tank Harness 57QT(58QT), 63QT(64QT)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING_______ NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
1. Reason for the Job__________________
R R Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific No specific No specific No specific No specific adhesive tapeadjustable access platformplastic spatulasafety barriers Torque Wrench : range 0.20 to 3.60 m.daN (2.00 to 26.00 lbf.ft)
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-013 USA MIL-R-46082 TYPE I MIL-S-22473
SEALANT, ANAEROBIC (Ref. 20-31-00)
Material No. 09-001 USA MIL-S-8802 TYPE I CLASS A
FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00) R Material No. 11-026 GB DEF-STAN 68-148/1 R SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
Material No. 15-008 AIB TN 10138 TYPE II GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
Material No. 19-010 USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 cable-ties 28-42-05 55A-010 1 cable-ties 28-42-05 56A-010
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-25-00-650-001 Pressure Defuel 28-42-00-740-001 Status Report (BITE) 28-42-15-400-005 Installation of the Fuel-Quantity-Probe
(21QT1/2,23QT1/2,25QT1/2,26QT1/2,27QT 1/2,28QT1/2/,29QT1/2,30QT1/2,34QT1/2,54QT1/2,56QT1/2, 59QT1/2,60QT1/2,61QT1/2)
28-46-00-740-001 Functional (BITE) Test 28-46-15-400-009 Installation of the Wing-Tank Fuel-Level Sensors 28-46-17-400-001 Installation of the Temperature Sensor 29QJ1 (29QJ2)
1EFF : 301-399, 1 28-42-43Page A427 1 1 Feb 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-46-19-400-001 57-27-11-000-001
57-27-11-000-002
57-27-11-400-001
57-27-11-400-002
28-42-43-991-014 28-42-43-991-015 28-42-43-991-019 FOR FIN 57QT, 63QT 28-42-46-400-001 FOR FIN 58QT, 64QT 28-42-48-400-001
3. Job Set-up
__________
Subtask 28-42-43-941-063
A. Safety Precautions
Installation of the IDG Shut-off Sensor.
Removal of the Access Panel (540AB, 540BB, 540CB,
540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
640DB, 640EB, 640FB, 640GB)
Removal of the Access Panel (540HB, 540JB, 540KB,
540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
....)
Installation of the Access Panel (540AB, 540BB,
540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
640CB, 640DB, 640EB, 640FB, 640GB)
Installation of the Access Panel (540HB, 540JB,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油6(12)