WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
(1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
(2) Make sure that the safety barriers are in position. Subtask 28-42-48-860-050
B. Aircraft Maintenance Configuration
(1)
Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).
(2)
Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-003).
1EFF : 301-399, 1 28-42-48Page 406 1 1 May 01/04 1 1 1CES 1
(3)
Make sure that the access platform is below the access panel 640AB.
(4)
Make sure that the access panel 640AB is removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-001).
Subtask 28-42-48-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/FQI/CHAN/2 2QT M27
4. Procedure
_________
(Ref. Fig. 401/TASK 28-42-48-991-001) Subtask 28-42-48-420-051
A. Preparation for Installation
(1)
Clean the component interfaces and the adjacent areas with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 28-42-48-420-050
B. Installation of the Ultracomp NOTE : You must bond the mating surfaces of the ultracomp (19) (Ref. TASK
____
28-42-48-991-001) (Ref. TASK 20-28-00-912-043).
(1)
Put the ultracomp (19) in position on the support bracket (16).
(2)
Install the washers (17) and the bolts (18).
(3)
Apply SEALANTS (Material No. 09-001) to the bolts (18) and the washers (17).
1EFF : 301-399, 1 28-42-48Page 407 1 1 May 01/04 1 1 1CES 1
(4)
Remove the blanking caps from the connectors of the electrical cables
(1), (2) and (3).
(5)
Put the connectors of the electrical cables (1), (2) and (3) in position on the correct connections on the ultracomp (19) (refer to the marker sleeves on the electrical connectors (1), (2) and (3)).
(6)
Install the washers (4), (5) and (9) and the nuts (6), (7) and (8).
(7)
TORQUE the nut (6) to between 28 and 48 lbf.in (0.31 and 0.54 m.daN).
(8)
TORQUE the nut (7) to between 23 and 27 lbf.in (0.25 and 0.30 m.daN).
(9)
TORQUE the nut (8) to between 10 and 14 lbf.in (0.11 and 0.15 m.daN).
(10)
Remove the blanking caps from the connectors of the electrical cables
(14) and (15).
(11)
Put the connectors of the the electrical cables (14) and (15) in position on the correct connections on the ultracomp (19) (refer to the marker sleeves on the electrical connectors (14) and (15)).
(12)
Install the washers (12) and (13) and the nuts (10) and (11).
(13)
TORQUE the nut (10) to between 10 and 14 lbf.in (0.11 and 0.15 m.daN).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油6(39)