1EFF : ALL 1 27-21-61Page 427 1 1 May 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-149, 201-299,
27-21-61-991-001 Fig. 401 R **ON A/C 151-199, 401-499,
27-21-61-991-001-A Fig. 401A
**ON A/C 301-399,
27-21-61-991-001-B Fig. 401B
**ON A/C 001-049, 051-099, 101-149, 201-299,
27-21-61-991-002 Fig. 402 R **ON A/C 151-199, 401-499,
27-21-61-991-002-A Fig. 402A
**ON A/C 301-399,
27-21-61-991-002-B Fig. 402B
**ON A/C ALL
27-21-61-991-003 Fig. 403
27-21-61-991-006 Fig. 404
27-21-61-991-004 Fig. 405
27-21-61-991-005 Fig. 406
3. Job Set-up
__________ R **ON A/C 001-003, 051-053,
Subtask 27-21-61-010-055
A. Get Access
(1)
Make sure that the access platform is in position at zone 132.
(2)
Make sure that the access door 825 is open.
(3)
Make sure that the access platform is in position at zone 154.
(4)
Make sure that the access door 826 is open.
(5)
Make sure that the access platform is in position at zone 312.
(6)
Make sure that the access door 312AR is open.
(7)
In the zones 211 and 221, make sure that the floor panels 211GF, 211KF, 221AF, 221EF, 231CF are removed.
(8)
In the zone 241, make sure that the floor panels 231WF, 241BF, 241FF, 241KF are removed.
(9)
In the zone 131, make sure that the ceiling panels 131AC, 131BC, 131CC are removed.
(10)
In the zone 131, make sure that the partition panel 131PW is removed.
(11)
In the zones 151 and 161, make sure that the ceiling panels 151AC, 151BC, 151CC, 151DC, 161AC, 161BC are removed.
(12)
In the zone 161, make sure that the partition panels 161DW, 162DW are removed.
R 1EFF : ALL 1 27-21-61Page 429 1 1 May 01/05 1 1 1CES 1R **ON A/C 151-199, 401-499,
Subtask 27-21-61-010-055-E
A. Get Access
(1)
Make sure that the access platform is in position at zone 132.
(2)
Make sure that the access door 825 is open.
(3)
Make sure that the access platform is in position at zone 154.
(4)
Make sure that the access door 826 is open.
(5)
Make sure that the access platform is in position at zone 312.
(6)
Make sure that the access door 312AR is open.
(7)
In the zones 211, 221 and 231, make sure that the floor panels 211GF, 211KF, 221EF, 231CF 221LF are removed.
(8)
In the zones 231 and 241, make sure that the floor panels 231WF, 241BF, 241FF, 241KF are removed.
(9)
In the zone 131, make sure that the ceiling panels 131KC, 131MC, 131NC are removed.
(10)
In the zone 131, make sure that the partition panel 131PW is removed.
(11)
In the zones 151 and 161, make sure that the ceiling panels 151EC, 151FC, 151GC, 161AC, 161BC are removed.
(12)
In the zone 161, make sure that the partition panels 161DW, 162DW are removed.
**ON A/C 301-399,
Subtask 27-21-61-010-055-D
A. Get Access
(1)
Make sure that the access platform is in position at zone 132.
(2)
Make sure that the access door 825 is open.
R 1EFF : 151-199, 301-399, 401-499, 1 27-21-61Page 430 1 1 Aug 01/05 1 1 1CES 1
R (3) Make sure that the access platform is in position at zone 154.
R (4) Make sure that the access door 826 is open.
R (5) Make sure that the access platform is in position at zone 312.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵2(65)