• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (4)
 Remove the access platform(s).

 


R  TASK 27-21-45-000-003 
R  Removal of the Cable Tension Regulator (103CM) 
R  1. Reason for the Job__________________ 
R  Self Explanatory 
R  2. Job Set-up Information______________________ 
R  A. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE  DESIGNATION 
R  -------------------------------------------------------------------------------
R  27-21-45-000-001  Removal of the Cable Tension Regulator Assy 
R  27-21-45-991-005  Fig. 404 
R  3. Job Set-up__________ 
R  Subtask 27-21-45-020-053 
R  A. Remove the cable tension regulator assy (Ref. TASK 27-21-45-000-001). 
R  4. Procedure_________ 
R  (Ref. Fig. 404/TASK 27-21-45-991-005) 
R  Subtask 27-21-45-020-054 
R  A. Removal of the Cable Tension Regulator 
R  (1) Remove the six screws (21). 
R  (2) Remove the plate (22). 
R  (3) Cut and discard the cotter pin (17) from the nut (18). 
R  (4) Remove the nut (18) and the washer (16). 
R  (5) Cut and discard the cotter pin (15) and unlock the nut (14). 
R  (6) Remove the pin (8), the bellcrank assy (19) and the sleeve (13). 
R  (7) Remove the six nuts (10) and the six bolts (12).

 

R R  Cable Tension Regulator (103CM) Figure 404/TASK 27-21-45-991-005
 1EFF : 1 1 1CES  ALL  1 111 27-21-45 Page 424 Feb 01/05

 

R  (8) Cut and discard the cotter pin (2) from the nut (1). 
R  (9) Remove the nut (1) and the washer (3). 
R  (10) Remove the bolt (7) with the washer (6). 
R  (11) Remove the side fittings (9) and (23) from the cable tension 
R  regulator (11). 
R  (12) Remove the cable tension regulator (11). 
R  NOTE : Do not remove the spacer (20), the link (4) and the spacer (5)____ 
R  from the side fitting (9).

 

R  TASK 27-21-45-400-003 
R  Installation of the Cable Tension Regulator (103CM) 
R  1. Reason for the Job__________________ 
R  Self Explanatory 
R  2. Job Set-up Information______________________ 
R  A. Consumable Materials 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  Material No. 08-003 USA MIL-S-22473 GRADE A MIL-R-46082 
R  SEALANT, ANAEROBIC (Ref. 20-31-00) 
R  Material No. 08-007 USA MIL-R-46082 TYPE II 
R  SEALANT, HIGH TEMP. (Ref. 20-31-00) 
R  B. Expendable Parts 
R  -------------------------------------------------------------------------------
R  FIG.ITEM |DESIGNATION |IPC-CSN 
R  -------------------------------------------------------------------------------
R  2 cotter pin 27-21-01 12B-170 
R  15 cotter pin 27-21-01 12B-170 
R  17 cotter pin 27-21-01 12B-280 
R  C. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  27-21-45-000-003 Removal of the Cable Tension Regulator (103CM) 
R  27-21-45-400-001 Installation of the Cable Tension Regulator Assy 
R  3. Job Set-up__________ 
R  Subtask 27-21-45-860-052 
R  A. Make sure that the cable tension regulator is removed (Ref. TASK 27-21-
R  45-000-003).

 

R  4. Procedure_________ 
R  Subtask 27-21-45-910-050 
R  A. Preparation for Installation 
R  (1) Clean the component interface and/or the adjacent area. 
R  (2) Do a visual inspection of the component interface and/or the adjacent 
R  area. 
R  Subtask 27-21-45-420-053 
R  B. Installation of the Cable Tension Regulator 
R  (1) Make sure that the spacer (4), the link (5) and the spacer (20) are 
R  still installed on the side fitting (9). 
R  (2) Install the side fittings (9) and (23) on the cable tension regulator 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵2(37)