(6)
 Open the access door 312AR.
 (7)
 In the zones 211, 221 and 231, remove the floor panels 211GF, 211KF, 221EF, 231CF 221LF (Ref. TASK 53-12-11-000-001), (Ref. TASK 53-12-12-000-001).
 (8)
 In the zones 231 and 241, remove the floor panels 231WF, 241BF, 241FF, 241KF (Ref. TASK 53-22-12-000-001), (Ref. TASK 53-32-12-000-002).
 (9)
 In the zone 131, remove the ceiling panels 131KC, 131MC, 131NC (Ref. TASK 25-54-12-000-002).
 (10)
 In the zone 131, remove the partition panel 131PW (Ref. TASK 25-54-12-000-001).
 (11)
 In the zones 151 and 161, remove the ceiling panels 151EC, 151FC, 151GC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK 25-55-12-000-002).
 (12)
 In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK 25-55-12-000-001).
R 1EFF : 001-003, 051-053, 151-199, 401-499, 1 27-21-61Page 413 1 1 Aug 01/05 1 1 1CES 1
R  **ON A/C 301-399,  
R  Subtask 27-21-61-010-050-D  
R  A. Get Access  
R  (1) Put the access platform at zone 132.  
R  (2) Open the access door 825.  
R  (3) Put the access platform at zone 154.  
R  (4) Open the access door 826.  
R  (5) Put the access platform at zone 312.  
R  (6) Open the access door 312AR.  
R  (7) In the zones 211 and 221, remove the floor panels 211GF, 211KF,  
R  221EF, 231CF 221LF (Ref. TASK 53-12-11-000-001) (Ref. TASK 53-12-12- 
R  000-001).  
R  (8) In the zone 241, remove the floor panels 231WF, 241BF, 241FF, 241KF  
R  (Ref. TASK 53-22-12-000-001) (Ref. TASK 53-32-12-000-002).  
R  (9) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC,  
R  131DC, 131EC (Ref. TASK 25-54-12-000-002).  
R  (10) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-54- 
R  12-000-001).  
R  (11) In the zones 151 and 161, remove the ceiling panels 151AY, 151AC,  
R  151BC, 151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002)  
R  (Ref. TASK 25-55-12-000-002).  
R  (12) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK  
R  25-55-12-000-001).
R  **ON A/C 001-049, 054-099, 101-149, 201-299,  
R  Post SB 53-1143 For A/C 001-003,  
R  Subtask 27-21-61-010-050-C  
R  A. Get Access  
R  (1) Put the access platform at zone 132.  
R  (2) Open the access door 825.  
R  (3) Put the access platform at zone 154.  
R  (4) Open the access door 826.  
R  (5) Put the access platform at zone 312.  
R  (6) Open the access door 312AR.  
R  (7) In the zones 211 and 221, remove the floor panels 211GF, 211KF,  
R  221EF, 231CF 221LF (Ref. TASK 53-12-11-000-001), (Ref. TASK 53-12-12- 
R  000-001).  
R  (8) In the zone 241, remove the floor panels 231WF, 241BF, 241FF, 241KF  
R  (Ref. TASK 53-22-12-000-001), (Ref. TASK 53-32-12-000-002).  
R  (9) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC  
R  (Ref. TASK 25-54-12-000-002).  
R  (10) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-54- 
R  12-000-001).  
R  (11) In the zones 151 and 161, remove the ceiling panels 151AC, 151BC,  
R  151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK  
R  25-55-12-000-002).  
R  (12) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK  
R  25-55-12-000-001). 
R 1EFF : 001-049, 054-099, 101-149, 201-299, 1 27-21-61Page 415 1 1 May 01/05 1 1 1CES 1 **ON A/C ALL
 Subtask 27-21-61-860-050
 B. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).
 (2)
 On the panel 23VU, make sure that the FLT CTL/FAC1 pushbutton switch is pushed (on this pushbutton switch, the OFF and FAULT legends are off).
 (3)
 On the panel 24VU, make sure that the FLT CTL/FAC2 pushbutton switch is pushed (on this pushbutton switch, the OFF and FAULT legends are off).
 (4)
 Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
 (5)
 On the center pedestal, on the panel 110VU, make sure that the RUD TRIM indicator shows 0.
 (6)
 On the panel 23VU, release the FLT CTL/FAC1 pushbutton switch (on this pushbutton switch, the OFF legend comes on).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵2(61)