(5)
On the center pedestal, on the panel 110VU, make sure that the RUD TRIM indicator shows 0.
(6)
In zone 121, install the PIN, RIGGING - RUDDER CONTROL (98A27901002000) (6) on the CAPT yaw/brake bellcrank (5) (Ref. Detail C).
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 401/TASK 27-21-45-991-001)
**ON A/C 301-399,
(Ref. Fig. 401A/TASK 27-21-45-991-001-A)
**ON A/C ALL
(7) In zone 311, install the PIN - RIGGING (98D27207547000) (8) or RIGGING PIN SET (98D27207516000) pin (98D27207516160) on the cable quadrant (1) (Ref. Details B and D).
(8) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003). R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 401/TASK 27-21-45-991-001)
**ON A/C 301-399,
(Ref. Fig. 401A/TASK 27-21-45-991-001-A)
**ON A/C ALL
(9) Make sure that the Yellow and Green hydraulic systems are depressurized. (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002)
(10) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002)
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 401/TASK 27-21-45-991-001)
**ON A/C 301-399,
(Ref. Fig. 401A/TASK 27-21-45-991-001-A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 402/TASK 27-21-45-991-002)
**ON A/C 301-399,
(Ref. Fig. 402A/TASK 27-21-45-991-002-A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 403/TASK 27-21-45-991-003)
**ON A/C 301-399,
(Ref. Fig. 403A/TASK 27-21-45-991-003-A)
**ON A/C ALL
Subtask 27-21-45-020-052
A. Removal of the Cable Tension-Regulator Assy
(1)
Remove the cotter pins (35) from the cable housings of the regulator
(15) (Ref. Details F and G).
(2)
Remove the cotter pins (50), the nuts (49), the washers (48), the screws (46) and the spacers (47) (Ref. Detail K).
(3)
Cut and remove the lockwire from the nuts (3) of the cable quadrant
(1) turnbuckles (Ref. Details B and D).
Cable Tension Regulator Assy
Figure 402/TASK 27-21-45-991-002
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 27-21-45Page 408 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
R Cable Tension Regulator Assy
Figure 402A/TASK 27-21-45-991-002-A
1EFF : 301-399, 1 27-21-45 Page 409
1 1 Nov 01/04
1 1
1CES 1
Cable Tension regulator Assy
Figure 403/TASK 27-21-45-991-003
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 27-21-45Page 410 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
R Cable Tension regulator Assy
Figure 403A/TASK 27-21-45-991-003-A
1EFF : 301-399, 1 27-21-45 Page 411
1 1 Nov 01/04
1 1
1CES 1
(4)
Loosen the nuts (3) and the screws (2) until it is possible to
install the TOOL - LOCKING (FE171901) (45) on the regulator (15)
(Ref. Details D and L).
(5)
Install the locking equipment (45) on the regulator (15) with the
rigging pins (44) (Ref. Detail L).
(6)
Fully loosen the nuts (3) and the screws (2).
(7)
Remove the cables (7) and (9) from the regulator (15) (Ref. Details F and G) and hang them on the structure.
(8)
Remove the cotter pin (40), the nut (41) and the washer (43) (Ref.
Detail J).
(9)
Remove the screw (42) and disconnect the rod (4) from the regulator (15).
(10)
Remove the cotter pin (38), the nut (37) and the washer (36) (Ref. Detail H).
(11)
Remove the screw (39) and disconnect the rod (23) from the regulator (15).
(12)
Remove the cotter pin (17), the nut (18) and the washer (19).
(13)
Remove the cotter pin (29), the nut (28) and the washer (27).
(14)
Remove the screws (22) (24), the spacers (21), (25) and remove the regulator (15).
1EFF : ALL 1 27-21-45Page 412 1 1 May 01/04R 1 1 1CES 1
TASK 27-21-45-400-001
Installation of the Cable Tension Regulator Assy