• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 three servocontrols (2), (3) and (4).

 5. Close-up
________
 Subtask 27-24-00-860-054

 A. Put the aircraft back to its initial configuration.
 (1)
 Depressurize the aircraft hydraulic systems (Ref. TASK 29-10-00-864-003) (Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001).

 (2)
 Remove the pointer of the LOAD APPLICATION TOOL - ELEVATOR, AILERON, RUDDER (98D27303000001) from the trailing edge of the rudder.

 (3)
 Remove the PIN - RIGGING (98D27207546000) (7) or RIGGING PIN SET (98D27207516000) from the output bellcrank of the lower servocontrol (4). (Ref. Fig. 501/TASK 27-24-00-991-003)


 Subtask 27-24-00-410-053
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access panels 325CL, 325CR, 325DL (Ref. TASK 55-33-13-410-001).

 (3)
 Install the protective cover on the battery power center 105VU.

 (4)
 Tighten the two screws.

 (5)
 Close the access door 822.

 (6)
 Remove the access platform(s).

 


 (7) Remove the warning notice(s). Subtask 27-24-00-710-052
 C. Do the operational test of the rudder mechanical control (Ref. TASK 27-24-00-710-001).
 Subtask 27-24-00-862-053
 D. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 RUDDER HYDRAULIC ACTUATION - INSPECTION/CHECK
_____________________________________________
 TASK 27-24-00-200-001
 Check of the Rudder Servo Controls and Hinge Bearings for too much Play and Condition
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 272400-02
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice(s)
 No specific access platform 5.87 m (19 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 27-24-00-200-002 Check of the Rudder Trailing Edge Play
 27-24-51-000-001 Removal of the Rudder Servo Control
 1025GM/2025GM/3025GM

R 27-24-51-200-001 Check of the Rudder Servo Control Attachments -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


27-24-51-400-001 29-10-00-863-003 29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001 55-36-41-000-001 55-36-41-400-001
55-46-11-000-001 55-46-11-400-001
3. Job Set-up
__________ Subtask 27-24-00-861-053
Installation of the Rudder Servo Control 1025GM/2025GM/3025GMPressurize the Blue Hydraulic System with a Ground Power SupplyDepressurize the Blue Hydraulic SystemPressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric PumpDepressurize the Green and Yellow Hydraulic Systems after Operation of the PTUPressurize the Yellow Hydraulic System with the Electric PumpDepressurize the Yellow Hydraulic SystemRemoval of the Hinge Arm Fittings No. 1 thru No. 7Installation of the Hinge Arm Fittings No. 1 thru No. 7Removal of Rudder Hinge Bearing No. 6Installation of Rudder Hinge Bearing No.6
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 27-24-00-010-052
 B. Get Access
 (1)
 Put the access platform at zone 325.

 (2)
 Open the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR, 325EL, 325ER.


 1EFF : ALL 1 27-24-00Page 602 1 1 Aug 01/05R 1 1 1CES 1


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵2(127)