• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-20 21:06来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______
 -FLUSH IT AWAY WITH CLEAN WATER
 -GET MEDICAL AID.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific masking tape No specific nonmetallic scraper No specific access platform 6 m (19 ft. 8 in.) No specific Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 1EFF : 401-499, 1 23-28-13Page 404 1 1 Aug 01/05 1 1 1CES 1 B. Consumable Materials


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-013  D TV-53-3507/73 RELEASE AGENT (OBSOLETE USE 05-013A) (Ref. 20-31-00)
 Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
 Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 Material No. 19-009  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.5MM DIA (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-004  Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
23-28-00-740-001 BITE Test of the Satellite Communication System 51-76-11-300-001 Repair of the Sealing 23-28-13-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 23-28-13-865-051
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
C/B NOT APPLICABLE
 1EFF : 401-499, 1 23-28-13Page 405 1 1 Aug 01/05 1 1 1CES 1 Subtask 23-28-13-860-050


 B. Aircraft Maintenance Configuration
 (1) Make sure that the access platform is in position at Zone 230.
 4. Procedure
_________ Subtask 23-28-13-910-050
 A. Preparation for Installation
 (Ref. Fig. 401/TASK 23-28-13-991-001)

 (1)
 Do an inspection of the component interface and/or the adjacent area.

 (2)
 Remove the used sealant with a nonmetallic scraper and clean the fuselage structure with CLEANING AGENTS (Material No. 11-003).

 (3)
 Clean the component interface and/or the adjacent area with CLEANING AGENTS (Material No. 11-003) and MISCELLANEOUS (Material No. 19-003).

 (4)
 Make sure that the electrical connectors are clean and in the correct condition.


 (5) Apply masking tape to the screw holes and the antenna connectors. Subtask 23-28-13-420-050
 B. Installation of the Antenna
 (Ref. Fig. 401/TASK 23-28-13-991-001)

 (1)
 Apply SPECIAL MATERIALS (Material No. 05-013) to the bottom of the antenna (2).

 (2)
 Remove the masking tape from the screws holes and the electrical connectors (3).

 (3)
 Make sure that the mounting base is installed (interface between the fuselage and the antenna).

 (4)
 Put the teflon gasket in position on the mounting base and align the gasket with the screw holes.

 (5)
 Remove the blanking caps from the electrical connectors.


 1EFF : 401-499, 1 23-28-13Page 406 1 1 Aug 01/05 1 1 1CES 1


 (6) Connect the electrical connector (3) and the coaxial connectors (6) to the antenna (2).
 WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______ REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
 (7)
 Safety the electrical connector (3) and the coaxial connectors (6) with MISCELLANEOUS (Material No. 19-009).

 (8)
 Install the antenna on the teflon gasket (2).

 (9)
 Install the screws (1) with a torque to 0.35 m.daN (30.97 lbf.in) and tighten in a diagonal sequence.


 (10)
 Make sure that the bonding contact resistance between the antenna (2) and the fuselage structure is not higher than 5.0 milliohms (Ref. TASK 20-28-00-912-004).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯1(142)