(2)
Put blanking caps on the disconnected electrical connectors.
(3)
Remove the clamps (13) and (11). NOTE : Do not discard the clamps (13) and (11). You must keep and use
____ them during the installation procedure.
(4)
Move the flexible sleeve (12) which is on the duct (10) to disengage the valve (15).
(5)
Remove the clamp (17) and the valve (15).
(6)
Discard the O-ring (16).
(7)
Remove the flexible sleeve (12).
Skin Exchanger Inlet Bypass Valve
Figure 401/TASK 21-26-55-991-002
1EFF : ALL 1 21-26-55 Page 403
1 1 Feb 01/98
1 1
1CES 1
(8) Put blanking plugs on the disconnected line ends.
R **ON A/C 051-052,
R Subtask 21-26-55-020-054-A
R A. Removal of the Skin Exchanger Inlet Bypass Valve
R (1) Disconnect the electrical connector (14) from the valve (15).
R (2) Put blanking caps on the disconnected electrical connectors.
R (3) Remove the clamps (13) and (11).
R (4) Move the flexible sleeve (12) which is on the duct (10) to disengage
R the valve (15).
R (5) Remove the clamp (17) and the valve (15).
R (6) Discard the O-ring (16).
R (7) Remove the flexible sleeve (12).
R (8) Put blanking plugs on the disconnected line ends.
R **ON A/C ALL
TASK 21-26-55-400-001
Installation of the Avionics Ventilation Skin Exchanger Inlet Bypass Valve
(16HQ)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
16 O-ring 21-26-01 17 -020
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 21-26-00-710-001 Operational Check of System via MCDU R 21-26-00-710-001 Operational Check of System via MCDU 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 52-41-00-410-002 Close the Avionics Compartment Doors after Access 53-12-13-000-001 Removal of the avionics compartment floor panels 53-12-13-400-001 Installation of the avionics compartment floor panels 21-26-55-991-002 Fig. 401
3. Job Set-up
__________
CAUTION : USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE
_______ THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-55-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
Subtask 21-26-55-010-058
B. Get Access
(1)
Make sure that the access platform is in position at the access door
824.
(2)
Make sure that the access door 824 is open.
(3)
Make sure that the access panel 128EG is removed (Ref. TASK 53-12-13-000-001).
Subtask 21-26-55-865-061
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/AVNCS VENT/CTL 6HQ D06
Subtask 21-26-55-210-053
D. Visual Inspection
(1) Make sure that the clamps, the flexible sleeve and the valve are in good condition; replace if necessary.
1EFF : ALL 1 21-26-55Page 406 1 1 May 01/05R 1 1 1CES 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(92)