A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access door 824 (Ref. TASK 52-41-00-410-002).
(3)
Remove the access platform(s).
Subtask 21-26-00-869-101
B. Aircraft Maintenance Configuration
(1)
Make an entry in the log book.
Subtask 21-26-00-862-080
C. De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
R TASK 21-26-00-040-009- 01
R Avionics Ventilation Filter Inoperative - Do the Deactivation of the R Conditioned-Air Inlet Valve (21HQ)
R 1. Reason for the Job
__________________
R Refer to the MMEL TASK: 21-26-09 c) R Avionics Equipment Ventilation R Ventilation filter
R 2. Job Set-up Information
______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------
R No specific circuit breaker(s) safety clip(s) R No specific 1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE R No specific AR CAP - BLANKING R No specific AR WARNING NOTICE
R B. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 21-26-00-710-001 R 24-41-00-861-002 R R 24-41-00-862-002 R R 31-60-00-860-001 R 31-60-00-860-002 R 52-41-00-410-002 R 21-26-00-991-009 Operational Check of System via MCDU Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power EIS Start Procedure EIS Stop Procedure Close the Avionics Compartment Doors after Access Fig. 404
R 3. Job Set-up__________
R Subtask 21-26-00-861-084
R A. Aircraft Maintenance Configuration
R (1) Energize the aircraft electrical circuits
R (Ref. TASK 24-41-00-861-002).
R (2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
R (Ref. TASK 31-60-00-860-001)
R Subtask 21-26-00-865-097
R B. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 49VU AIR COND/AVNCS VENT/CTL 5HQ D05
R Subtask 21-26-00-010-089
R C. Get Access
R (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
R access door 824.
R (2) Open the access door 824.
R 4. Procedure_________
R (Ref. Fig. 404/TASK 21-26-00-991-009)
R Subtask 21-26-00-040-065
R A. Opening Procedure of the Conditioned-Air Inlet Valve
R (1) On the VENTILATION section of the overhead panel 22VU:
R - release the EXTRACT pushbutton switch (the OVRD legend comes on).
R (2) On the conditioned-air inlet valve 21HQ:
R (a) Disconnect the connector 21HQ-A from the valve 21HQ.
R (b) Put CAP - BLANKING on the disconnected electrical connectors.
R (c) Keep the electrical cable and its connector near the valve.
R (d) Fully open the valve 21HQ with the manual mechanism.
R (3) On the bottom part of the upper ECAM display unit:
R - the VENT AVNCS SYS FAULT warning comes into view.
R Ignore this warning.
R On the ECAM control panel:
R - push the CLR key.
R (4) Remove the safety clip(s) and the tag(s) and close this(these)
R circuit breaker(s):
R 5HQ.
R (5) Do an operational test of the avionics equipment ventilation from the
R MCDU (Ref. TASK 21-26-00-710-001).
R 5. Close-up________
R Subtask 21-26-00-410-086
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Close the access door 824 (Ref. TASK 52-41-00-410-002).
R (3) Remove the access platform(s).
R Subtask 21-26-00-942-083
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(23)