• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (2) Put blanking caps on the disconnected electrical connectors. 
R  (3) Remove the clamps (4) and (2). 
R  (4) Move the flexible sleeve (3) on the pipe (1) to release the valve 
R  (6). 
R  (5) Remove the clamp (8) and remove the valve (6). 
R  (6) Remove and discard the O-ring (7). 
R  (7) Remove the flexible sleeve (3). 
R  (8) Put blanking plugs on the disconnected line ends.

 


R **ON A/C ALL
 TASK 21-26-54-400-001
 Installation of the Conditioned Air Inlet Valve (21HQ)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific platform 1.6 m (5 ft. 3 in.)
 B. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
 -------------------------------------------------------------------------------
O-ring 21-26-01 09 -020
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
R 21-26-00-710-001 Operational Check of System via MCDU R 21-26-00-710-001 Operational Check of System via MCDU 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 52-41-00-410-002 Close the Avionics Compartment Doors after Access 21-26-54-991-001 Fig. 401


 3. Job Set-up
__________
 CAUTION : USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE

_______ THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
 Subtask 21-26-54-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 Subtask 21-26-54-010-051
 B. Get Access
 (1) Make sure that the platform is in position at the access door 824.
 (2) Make sure that the access door 824 is open. Subtask 21-26-54-865-051
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/AVNCS VENT/CTL 6HQ D06 49VU AIR COND/AVNCS VENT/CTL 5HQ D05 122VU AIR COND/AVNCS/VENT/MONG 3HQ Y17
 1EFF : ALL 1 21-26-54Page 406 1 1 May 01/05R 1 1 1CES 1


 4. Procedure
_________ (Ref. Fig. 401/TASK 21-26-54-991-001) R **ON A/C 001-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 21-26-54-420-050
 A. Installation of the Conditioned Air Inelt Valve
 (1)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Remove the blanking plugs from the disconnected line ends.

 (4)
 Install the flexible sleeve (3) on the pipe (1).

 (5)
 Install the new O-ring (7) in the pipe (9) groove.

 (6)
 Install the valve (6) in the flexible sleeve (3). NOTE : The arrow which shows the airflow direction must be point up.

____

 (7)
 Make sure that the valve (6) is in the correct angular position. The electrical cable must not be too tight or too loose.

 (8)
 Install the clamp (8) and torque to the value given on the clamp.

 (9)
 Put the flexible sleeve (3) in position.


 (10)
 Install the clamps (2) and (4) and tighten them. NOTE : Use the clamps (2) and (4) kept during the removal procedure.

____

 (11)
 Remove the blanking caps from the electrical connectors.

 (12)
 Make sure that the electrical connectors are clean and in the correct condition.

 (13)
 Connect the electrical connector (5).

 


R  **ON A/C 051-052, 
R  Subtask 21-26-54-420-050-A 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(90)