CARGO COMPARTMENT VENTILATION - DEACTIVATION/REACTIVATION
_________________________________________________________
TASK 21-28-00-040-002
Deactivation of the Aft Cargo-Compartment Ventilation Isolation-Valves 33HN,
34HN
1. Reason for the Job
__________________
Refer to the MMEL TASK: 21-28-05
Cargo Compartment Ventilation
AFT cargo
Isolation Valve
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power R 25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo Compartment - FR47/FR59 25-55-11-400-003 Installation of the Sidewall Panels in the AFT Cargo
Compartment - FR47/FR59 25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65 25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
21-28-00-991-002 Fig. 401 R **ON A/C 151-199, 401-499,
21-28-00-991-002-A Fig. 401A
**ON A/C ALL
3. Job Set-up
__________
Subtask 21-28-00-861-058
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-28-00-865-059
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
122VU AIR COND/AFT CARGO VENT/FAN 30HN S22
R **ON A/C ALL
Subtask 21-28-00-865-078
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------
122VU AIR COND/AFT CARGO VENT/CTL AND/MONG 31HN 20 S or alternative location :-49VU AIR COND/AFT CARGO/VENT/CTL & MONG 31HN 07 C
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 21-28-00-010-055
D. Get Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(104)