REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage R and in the Wings (this does not include the tanks)-
21-26-00-710-001  Operational Test of the Avionics Equipment Ventilation from the Multipurpose Control and Display Unit (MCDU)
 21-26-00-710-001 Operational Test of the Avionics Equipment Ventilation (without the CFDS) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 21-26-52-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 21-26-52-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 Subtask 21-26-52-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/AVNCS VENT/CTL 6HQ D06 49VU AIR COND/AVNCS VENT/CTL 5HQ D05 122VU AIR COND/AVNCS/VENT/MONG 3HQ Y17


 Subtask 21-26-52-010-051
 C. Get Access
 (1) Make sure that the access platform is in position at the access door 824.
 (2) Make sure that the access platform on the left side of the aircraft below the valve.
 4. Procedure_________
 (Ref. Fig. 401/TASK 21-26-52-991-001)
 Subtask 21-26-52-420-051 
R  A. Installation of the Skin Air-Inlet Valve 
R R  (1) Clean the component interface and/or the adjacent area. 
R  (2) Do an inspection of the component interface and/or the adjacent area. 
R R  NOTE : Make sure that the deactivation switch of the valve is in the____ ON position. 
R  (3) Remove the blanking plug from the air inlet. 
R  (4) Install a new O-ring (2) in the groove of the valve (4). 
R R  (5) Apply SEALANTS (Material No. 09-019) between the structure (1) and the valve (4). 
R  (6) Remove the blanking caps from the electrical connectors. 
R  (7) Make sure that the electrical connectors are clean and in the correct condition. 
R  (8) Connect the electrical connector (5). 
R  (9) Put the valve (4) in position on the structure (1). 
R  (10) Install the screws (3) and tighten. 
R R  NOTE : Make sure you do the bonding with the screw at the top and the____ screw at the bottom (Ref. TASK 20-28-00-912-004).

 

 Subtask 21-26-52-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 3HQ, 5HQ, 6HQ
 Subtask 21-26-52-710-050
 C. Do an operational test of the ventilation system of the avionics
 equipment. (Ref. TASK 21-26-00-710-001)

 NOTE : As an alternative procedure, you can do this operational test
____
 without the CFDS (Ref. TASK 21-26-00-710-001).

 5. Close-up
________ Subtask 21-26-52-010-052
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Remove the access platform(s). Subtask 21-26-52-862-051
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 1EFF : ALL 1 21-26-52Page 408 1 1 Aug 01/02R 1 1 1CES 1


 VALVE - SKIN AIR OUTLET (22HQ) - REMOVAL/INSTALLATION
_____________________________________________________ R **ON A/C 001-049, 051-058, 101-101,
 TASK 21-26-53-000-001
 Removal of the Skin Air Outlet-Valve (22HQ)

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 212653-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.1 m (10 ft. 2 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 