• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  123VU AVNCS VENT/BLOWER/FAN 1HQ AD10 
R  123VU AVNCS VENT/EXTC/FAN 2HQ AE02 
R  Subtask 21-26-43-010-097 
R  D. Get Access 
R  (1) Put the access platform in position below the avionics-compartment 
R  aft door 824. 
R  (2) Open the access door 824. 
R  4. Procedure_________ 
R  (Ref. Fig. 404/TASK 21-26-43-991-033) 
R  Subtask 21-26-43-020-084 
R  A. Removal of the Demister Filter and Filter Cartridge 
R  (1) Remove the demister filter (Ref. TASK 21-26-43-600-018). 
R  (2) Remove the filter cartridge (Ref. TASK 21-26-43-600-019). 
R  NOTE : Close the door and lock the four elastic-fastener devices for____ 
R  the removal of the body. 
R  Subtask 21-26-43-910-055 
R  B. The body filter weighs approximately 4.6 kg (10.14 lb). Make sure that 
R  you support it correctly.

 

R Filter Assembly (2081HM, 2082HM, 2083HM) R Figure 404/TASK 21-26-43-991-033
 1EFF : 001-049, 101-105, 1 21-26-43Page 422 1 1 Config-2 Aug 01/05 1 1 1CES 1


R  Subtask 21-26-43-020-085 
R  C. Removal of the Filter Assembly 
R  (1) Remove the clamps (1). 
R  (2) Move the flexible sleeve (14) on the duct (15) to disengage the 
R  filter body (4). 
R  (3) Remove the clamp (9). 
R  (4) Release the drain hose (8). 
R  (5) Remove the 28 nuts (7) and screws (10) while you hold the equipped 
R  flange (12). 
R  (6) Remove the nuts (5) and the screws (2). 
R  (7) Remove the filter body (4). 
R  (8) Remove the seal (11) and discard it. 
R  (9) Put PLUG - BLANKING on the disconnected line ends.

 

R TASK 21-26-43-400-007 R Installation of the Filter Assembly (2081HM, 2082HM, 2083HM) R 1. Reason for the Job
__________________ R Self Explanatory R 2. Job Set-up Information
______________________ R A. Fixtures, Tools, Test and Support Equipment R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------R No specific access platform 1.6 m (5 ft. 3 in.)
R B. Expendable Parts R -------------------------------------------------------------------------------R FIG.ITEM |DESIGNATION |IPC-CSN R -------------------------------------------------------------------------------
R 11 seal 21-26-01 03K-365 R C. Referenced Information R -------------------------------------------------------------------------------

R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 21-26-43-600-018 R 21-26-43-600-019 R 24-41-00-861-002 R R 24-41-00-862-002 R R 24-42-00-861-001 R R 24-42-00-862-001 R R 52-41-00-410-002 R 21-26-43-991-033 Servicing of the Demister Filter (2081HM) Servicing of the Filter Cartridge (2082HM) Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External Power Close the Avionics Compartment Doors after Access Fig. 404


R  3. Job Set-up__________ 
R  Subtask 21-26-43-860-060 
R  A. Aircraft Maintenance Configuration 
R  (1) Make sure that the aircraft electrical circuits are de-energized 
R  (Ref. TASK 24-41-00-862-002). 
R  (2) Make sure that the ground service network is energized (Ref. TASK 24-
R  42-00-861-001). 
R  Subtask 21-26-43-865-125 
R  B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and 
R  tagged 
R  -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION 
R  -------------------------------------------------------------------------------
R  49VU AIR COND/AVNCS VENT/CTL 6HQ D06 
R  49VU AIR COND/AVNCS VENT/CTL 5HQ D05 
R  122VU AIR COND/AVNCS/VENT/MONG 3HQ Y17 
R  123VU AVNCS VENT/BLOWER/FAN 1HQ AD10 
R  123VU AVNCS VENT/EXTC/FAN 2HQ AE02 
R  Subtask 21-26-43-010-098 
R  C. Get Access 
R  (1) Make sure that the access platform is in position below the 
R  avionics-compartment aft door 824. 
R  (2) Make sure that the access door is open 824. 
R  Subtask 21-26-43-160-075 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(77)