-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
21-28-00-991-004-A Fig. 402 R **ON A/C 151-199, 401-499,
21-28-00-991-004 Fig. 402A
**ON A/C ALL
3. Job Set-up
__________
Subtask 21-28-00-861-075-A
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 21-28-00-010-076-B
B. Get Access
(1)
Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
(2)
Put the access platform at the AFT cargo-compartment door 826.
(3)
Remove the access panel (Ref. TASK 25-55-12-000-001):
(a) FOR 33HN
-162DW.
(4)
Remove the access panel (Ref. TASK 25-55-11-000-003):
(a) FOR 34HN
-151EW.
(2)
Make sure that the electrical connectors are clean and in the correct condition.
(3)
Remove the temporary attachments and connect the electrical connectors (3), (33HN-A and 34HN-A).
(4)
Make sure that the work area is clean and clear of tool(s) and other items.
R **ON A/C 151-199, 401-499,
Subtask 21-28-00-010-076
B. Get Access
R (1) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001). (2) Put the access platform at the AFT cargo-compartment door 826. (3) Remove the access panel (Ref. TASK 25-55-12-000-001): (a) FOR 33HN - 162DW.
R (4) Remove the access panel (Ref. TASK 25-55-11-000-003): (a) FOR 34HN - 151VW.
**ON A/C ALL
4. Procedure_________ Subtask 21-28-00-440-053-A
A. Reactivation of the AFT cargo-Compartment Ventilation Isolation-Valves **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
R (Ref. Fig. 402/TASK 21-28-00-991-004-A) **ON A/C 151-199, 401-499,
(Ref. Fig. 402A/TASK 21-28-00-991-004) **ON A/C ALL
(1) Remove the blanking plugs from the disconnected electrical connectors.
Subtask 21-28-00-865-077
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
122VU AIR COND/AFT CARGO VENT/FAN 30HN S22
R **ON A/C ALL
Subtask 21-28-00-865-081
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION FIN LOCATION
-------------------------------------------------------------------------------
122VU AIR COND/AFT CARGO VENT/CTL AND/MONG 31HN 20 S
or alternative location :-
49VU AIR COND/AFT CARGO/VENT/CTL & MONG 31HN 07 C
Subtask 21-28-00-810-056-A
D. Do the trouble shooting of the cargo-compartment ventilation system (Ref. TSM ATA 21) and do the applicable corrective maintenance procedure(s).
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 21-28-00-410-076-B
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel (Ref. TASK 25-55-12-400-001):
(a) FOR 33HN
-162DW.
(3)
Install the access panel (Ref. TASK 25-55-11-400-003):
(a) FOR 34HN
-151EW.
(4)
Remove the access platform(s).
(5)
Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).
R **ON A/C 151-199, 401-499,
Subtask 21-28-00-410-076
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel (Ref. TASK 25-55-12-400-001): R (a) FOR 33HN
-162DW.
(3)
Install the access panel (Ref. TASK 25-55-11-400-003): R (a) FOR 34HN
-151VW.
(4)
Remove the access platform(s).
(5)
Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).