• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).

 

 

R **ON A/C 151-199, 401-499,
 Subtask 21-28-00-410-063-A
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel 162DW (Ref. TASK 25-55-12-400-001).

 (3)
 Install the access panel 151VW (Ref. TASK 25-55-11-400-003).

 (4)
 Remove the access platform(s).

 (5)
 Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).


 **ON A/C ALL
 Subtask 21-28-00-862-063
 C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002) TASK 21-28-00-710-006


 Operational Test of the AFT Cargo-Compartment Ventilation-System
 1. Reason for the Job
__________________
R There are alternative procedures in this task:
R - For aircraft WITH ventilation isolation valve position indications on the
R ECAM COND page.
R - For aircraft WITHOUT ventilation isolation valve position indications on
R the ECAM COND page.
R - Do a check of the aircraft configuration with regard to these ECAM
R indications before you do the test.

 2. Job Set-up Information
______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------
R No specific access platform 2 m (6 ft. 7 in.)
R B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002
24-41-00-862-002
R 25-55-11-000-003 R R 25-55-11-400-003 R R 25-55-12-000-001 R 25-55-12-400-001 R
31-60-00-860-001
31-60-00-860-002 R 52-30-00-860-001 R R 52-30-00-860-002 R Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External Power Removal of the Sidewall Panels in the AFT Cargo Compartment - FR47/FR59 Installation of the Sidewall Panels in the AFT Cargo Compartment - FR47/FR59 Removal of the AFT Cargo Compartment Partition FR65 Installation of the AFT Cargo Compartment Partition FR65EIS Start ProcedureEIS Stop Procedure Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump


 3. Job Set-up__________
 Subtask 21-28-00-861-070
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-28-00-865-072
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R R  122VU AIR COND/AFT CARGO VENT/FAN 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1  30HN 4HK 3HK 2HK 1HK  S22V20V19V18V17 
R  **ON A/C ALL
 Subtask 21-28-00-865-083
 C. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION -------------------------------------------------------------------------------122VU AIR COND/AFT CARGO VENT/CTL AND/MONG 31HN 20 S or alternative location :-49VU AIR COND/AFT CARGO/VENT/CTL & MONG 31HN 07 C
 **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
 Subtask 21-28-00-010-065
 D. Get Access
 NOTE : This procedure is only applicable for aircraft WITHOUT ventilation____ isolation valve positions indicated on the ECAM COND page.
 (1) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
 (2) Put the access platform at the AFT cargo-compartment door 826.

 

 (3)
 Remove the access panel 162DW (Ref. TASK 25-55-12-000-001).

 (4)
 Remove the access panel 151EW (Ref. TASK 25-55-11-000-003).

 

R **ON A/C 151-199, 401-499,
 Subtask 21-28-00-010-065-A
 D. Get Access NOTE : This procedure is only applicable for aircraft WITHOUT ventilation
____ isolation valve positions indicated on the ECAM COND page.
 (1)
 Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(112)