R 4. Procedure_________
R (Ref. Fig. 404/TASK 21-26-43-991-033)
R Subtask 21-26-43-420-084
R A. Installation of the Filter Assembly
R (1) Remove the blanking plugs from the disconnected line ends.
R (2) Install the filter body (4) with a new seal (11) on the blowing duct
R (6).
R (3) Install the screws (2) and the nuts (5). Do not fully tighten at this
R time.
R (4) Install the screws (10) and the nuts (7) with the equipped flange
R (12) and tighten.
R (5) Tighten the screws (2).
R (6) Install the drain hose (8).
R (7) Install the clamp (9) and tighten.
R (8) Install the flexible sleeve (14).
R (9) Install and tighten the clamps (1).
R (10) Make sure that the attachments (3) are correctly tightened.
R (11) Release each of the four fasteners, open the door and install the
R filter cartridge (Ref. TASK 21-26-43-600-019).
R (12) Install the demister filter (Ref. TASK 21-26-43-600-018).
R 5. Close-up________
R Subtask 21-26-43-410-091
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Close the access door 824 (Ref. TASK 52-41-00-410-002).
R (3) Remove the access platform(s).
R Subtask 21-26-43-865-126
R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 1HQ, 2HQ, 3HQ, 5HQ, 6HQ
R Subtask 21-26-43-861-121
R C. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R Subtask 21-26-43-862-116
R D. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
R **ON A/C 001-049, 101-149, 151-199, 201-299,
R Post SB 21-1087 For A/C 001-049,101-105,
R FILTER ASSY - AVIONICS VENTILATION - ADJUSTMENT/TEST____________________________________________________
TASK 21-26-43-710-001
Operational Test of the Check Valve of the Syphon Assembly
1. Reason for the Job
__________________
Refer to the MPD TASK: 212643-09
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
21-26-43-100-001 Inspection of the Siphon Assembly (Strainer) for Cleanliness 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 21-26-43-991-016 Fig. 501
R 1EFF : 001-049, 101-149, 151-199, 201-299, 1 21-26-43Page 501 1 1 May 01/05 1 1 1CES 1
3. Job Set-up
__________ Subtask 21-26-43-865-087
A. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/AVNCS VENT/CTL 6HQ D06 49VU AIR COND/AVNCS VENT/CTL 5HQ D05 122VU AIR COND/AVNCS/VENT/MONG 3HQ Y17 123VU AVNCS VENT/BLOWER/FAN 1HQ AD10 123VU AVNCS VENT/EXTC/FAN 2HQ AE02
Subtask 21-26-43-941-067
B. Safety Precautions
(1) Make sure that the throttle control levers of the engines 1 and 2 are at idle.
Subtask 21-26-43-861-086
C. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
Subtask 21-26-43-860-055
D. Aircraft Maintenance Configuration
(1) On the VENTILATION section of the panel 22VU:
-make sure that the BLOWER and EXTRACT pushbutton switches are in the AUTO configuration (pushed and with the FAULT and OVRD legends off).
4. Procedure
_________ (Ref. Fig. 501/TASK 21-26-43-991-016) Subtask 21-26-43-710-054
A. Operational Test of the Check Valve of the Syphon Assembly NOTE : The energization of the aircraft electrical circuits starts a full
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(78)