• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (5) Make sure that the contact faces of the heat exchanger have no cracks, dents or
 (6) Make sure that the inside of the heat exchanger is clear of tools and other items. other damage.
 (7) Remove the blanking plugs from the disconnected line ends.

 

_______
 IF YOU DO:

 -RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
 -WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
 (a) With a spatula apply a layer of bonding compound BONDING AND ADHESIVE COMPOUNDS (Material No. 08-004) to the contact faces of the heat exchanger and the ducts. You must wait 5 minutes before you install the gaskets and the ducts.
 5. Close-up
________ R **ON A/C 001-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 21-26-42-420-052
 A. Install the Inlet Duct
 (1)
 Carefully install the new gasket (11) and the new gasket (1) on the heat exchanger.

 (2)
 Put the duct (12) in position. Install the washers (10) and the screws (9).

 (3)
 Tighten the screws (9) in the sequence given

 (4)
 Install the flexible sleeve (13) on the duct (12).

 (5)
 Install the new O-ring (6) in the groove of the duct (2).

 (6)
 Put the duct (2) in position. Install the washers (3) and the screws (4).

 (7)
 Tighten the screws (4) in the sequence given.

 (8)
 Put the flexible sleeve (13) in position.

 (9)
 Install and tighten the clamps (8). NOTE : Use the clamps (8) kept during the removal procedure.


____
 (10) Install the clamp (5). Tighten it to the value given on the clamp.


 (11) Install and tighten the support clamp (7).
 NOTE : Release the isolation valve of the heat exchanger from the____
 structure.
 (12) Carefully install the insulating blankets around the base of the
 ducts. 
R  **ON A/C 051-052, 
R  Subtask 21-26-42-420-052-A 
R  A. Install the Inlet Duct 
R  (1) Carefully install the new gasket (11) and the new gasket (1) on the 
R  heat exchanger. 
R  (2) Put the duct (12) in position. Install the washers (10) and the 
R  screws (9). 
R  (3) Tighten the screws (9) in the sequence given 
R  (4) Install the flexible sleeve (13) on the duct (12). 
R  (5) Install the new O-ring (6) in the groove of the duct (2). 
R  (6) Put the duct (2) in position. Install the washers (3) and the screws 
R  (4). 
R  (7) Tighten the screws (4) in the sequence given. 
R  (8) Put the flexible sleeve (13) in position. 
R  (9) Install and tighten the clamps (8). 
R  (10) Install the clamp (5). Tighten it to the value given on the clamp. 
R  (11) Install and tighten the support clamp (7). 
R  NOTE : Release the isolation valve of the heat exchanger from the____ 
R  structure. 
R  (12) Carefully install the insulating blankets around the base of the 
R  ducts.

 


R **ON A/C ALL
 Subtask 21-26-42-410-051
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 822.


 (3) Remove the access platform(s).
 Subtask 21-26-42-865-052

 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6HQ
 Subtask 21-26-42-862-052
 D. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 TASK 21-26-42-200-002
 Inspection/Check of the Skin Heat Exchanger (Outlet Duct)
 1. Reason for the Job
__________________
 To examine the condition around the drain holes in the skin heat exchanger.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific soft scraper
 No specific spatula
 No specific access platform 1.60 m (5 ft. 3 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 2(52)