• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 36-11-49-400-042  Installation of the Pylon Interface Duct
 36-12-41-000-001  Removal of a Bleed-Air Duct
 36-12-41-400-001  Installation of a Bleed-Air Duct
 49-00-00-860-003  APU Start by External Power (GTCP 36-300)
 49-00-00-860-004  APU Shutdown by External Power (GTCP 36-300)
 49-00-00-860-005  APU Start by External Power (APS 3200)
 49-00-00-860-006  APU Shutdown by External Power (APS 3200)
 49-00-00-860-008  APU Start by External Power (131-9(A))
 49-00-00-860-009  APU Shutdown by External Power (131-9(A))
 53-35-13-000-002  Removal of the Quick-Release Access Panels from the
 Belly Fairing Structure
 53-35-13-400-002  Installation of the Quick-Release Access Panels on
 the Belly Fairing Structure
 71-00-00-710-003  Engine Automatic Start
 71-00-00-710-028  Engine Shutdown
 ACMM 211104
 CMM 214302
 CMM 214352
 CMM 215110
 CMM 215202
 CMM 215204
 CMM 215234
 21-00-00-991-004  Fig. 201 

R 1EFF : ALL 1 21-00-00Page A201 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-00-00-991-002 Fig. 203
 3. Job Set-up
__________ Subtask 21-00-00-941-053
 A. Necessary Special Tools
 (1)
 Special blanking caps - locally manufactured - see Job Set-up 2 off. Manufactured with reference to (Ref. Fig. 201/TASK 21-00-00-991-004) and to SIL 21-029.

 (2)
 Temperature simulating devices - locally manufactured - see Job Set-up 3 off. Manufactured with reference to: (Ref. Fig. 203/TASK 21-00-00-991-002) and to SIL 21-029.


 Subtask 21-00-00-861-053
 B. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-00-00-860-074
 C. Aircraft Maintenance Configuration
 (1)
 Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

 (2)
 On the ECAM control panel push the COND pushbutton switch.

 (3)
 Make sure that at least one of the CKPT, the FWD cabin or the AFT cabin temperatures shown on the ECAM lower display unit (DU) is more than 24 deg. C.

 (4)
 If none of the temperatures is more than 24 deg. C you must do the alternative ECS decontamination procedure (Ref. TASK 21-00-00-615-003).


R 1EFF : ALL 1 21-00-00Page A202 1 1 Aug 01/05 1 1 1CES 1 Subtask 21-00-00-865-076


 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU AIR BLEED/ENG 1/MONG  2HA1  D11 
R  **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  4HK 3HK 2HK 1HK 21HH 23HH 1HH 3HH 24HH 22HH  V20V19V18V17W22W21X22X21Y21Y20 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18
 **ON A/C ALL 
R R R R  122VU AIR COND/RECIRC FAN/R/CTL 122VU AIR COND/RECIRC FAN/R/SPLY 122VU AIR COND/RECIRC FAN/L/CTL 122VU AIR COND/RECIRC FAN/L/SPLY 122VU AIR BLEED/ENG 2/MONG  11HG 3HG 2HG 1HG 2HA2  W20 W18 X20 X18Z22 

R 1EFF : ALL 1 21-00-00Page A203 1 1 Aug 01/05 1 1 1CES 1


R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R R R R R R 122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  53HH 55HH 49HH 51HH 56HH 54HH 50HH  W22 W21 X22 X21 Y21 Y20Y18 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(93)