Refer to the MMEL TASK: 21-28-05 409 ALL
Deactivation of the AFT 415 ALL
Cargo-Compartment Ventilation
Isolation-Valves 33HN, 34HN
Refer to the MMEL TASK: 21-28-06 415 ALL
Reactivation of the AFT 423 ALL
Cargo-Compartment Ventilation
Isolation-Valves 33HN, 34HN
Refer to the MMEL TASK: 21-28-06 423 ALL
CARGO COMPARTMENT VENTILATION 21-28-00
ADJUSTMENT/TEST 501 ALL
Functional Test of the AFT 501 ALL
Cargo-Compartment
21-CONTENTS Page 15 Aug 01/05 R CES
CHAPTER 21
__________
AIR CONDITIONING
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Ventilation-System Operational Test of the AFT 508 ALL Cargo-Compartment Ventilation-System
CONTROLLER - VENTILATION 21-28-34
REMOVAL/INSTALLATION 401 ALL
Removal of the Ventilation 401 ALL
Controller (10HN)
Installation of the Ventilation 404 ALL
Controller (10HN)
VALVE - ISOLATION, AFT CARGO 21-28-52
COMPARTMENT
REMOVAL/INSTALLATION 401 ALL
Removal of the AFT 401 ALL
Cargo-Compartment Ventilation
Isolation-Valves (33HN, 34HN)
Installation of the AFT 410 ALL
Cargo-Compartment Ventilation
Isolation-Valves (33HN, 34HN)
FAN - EXTRACTION, AFT CARGO 21-28-54
COMPARTMENT
REMOVAL/INSTALLATION 401 ALL
Removal of the Aft 401 ALL
Cargo-Compartment Ventilation
Extraction-Fan (35HN)
Installation of the Aft 405 ALL
Cargo-Compartment Ventilation
Extraction-Fan (35HN)
PRESSURIZATION CONTROL 21-30-00
______________________
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
System Description 1 ALL
Automatic Operation 1 ALL
Semi-Automatic Operation 1 ALL
Manual Operation 1 ALL
PRESSURE CONTROL AND MONITORING 21-31-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 1 ALL
System Description 7 ALL
The Pressure Control and 7 001-049, 051-099 Monitoring System 101-105, 151-199 201-299, 301-302 Pressure Schedules 9 ALL
21-CONTENTS Page 16 Aug 01/05 R CES
CHAPTER 21__________
AIR CONDITIONING
TABLE OF CONTENTS_________________
SUBJECT CH/SE/SU_______ ________ C_ PAGE EFFECTIVITY____ ___________
Power Supply 16 ALL
Interface 16 ALL
System Interfaces 17 001-049, 051-061
101-105, 201-203
FMGS - Interface 17 001-049, 051-061
101-105, 201-203
System Interfaces 28 062-099, 106-149
151-199, 204-299
301-399, 401-499
FMGS - Interface 28 062-099, 106-149
151-199, 204-299
301-399, 401-499
LGCIU Interface 29 ALL
EIU Interface 29 ALL
CFDS Interface 29 ALL
Explanations to the Parameter 29 ALL
List
Pressurization Control Parameter 32 ALL
List EQPT: 5C
Alpha Call-up List. 35 ALL
Component Description 35 ALL
Cabin Pressure Controller (CPC) 35 ALL
Outflow Valve 39 ALL
Outflow Valve 42 ALL
Protection Creel 44 106-149, 151-199
201-299, 301-399
401-499,
Safety Valves 45 ALL
Operation/Control and Indicating 45 ALL
Automatic Operation 45 ALL
Semi-Automatic Operation 49 ALL
Manual Operation 49 ALL
Operation if there is a Failure 50 001-049, 051-099
101-105, 151-199
201-299, 301-302
Operation if there is a Failure 50 106-149, 303-399
401-499,
Control and Indicating 51 ALL
Failure Indications 54 ALL
Cabin Altitude Indication 55 ALL
BITE Test 58 ALL
CPC Power-Up Test 58 ALL
CPC Reset 58 ALL
Built-In Test Equipment 58 ALL
MCDU Maintenance Messages 64 ALL
MCDU Maintenance Messages 72 ALL
21-CONTENTS Page 17
Aug 01/05
R
CES
CHAPTER 21 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(45)