CHAPTER 21
__________
AIR CONDITIONING
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ the Safety Valves Resistance Check of the Return 530 ALL Ground Connections - Cabin Pressure Controller (CPC) 1 (11HL) and 2 (12HL) and the Electronic Modules 10HL-1 and 10HL-2
PRESSURE CONTROL AND MONITORING 21-31-00
CLEANING/PAINTING 701 ALL
Cleaning of the Moveable Seals of 701 ALL
the Outflow-Valve
CONTROLLER - CABIN PRESSURE 21-31-34
REMOVAL/INSTALLATION 401 ALL
Removal of the Cabin Pressure 401 ALL
Controller (11HL, 12HL)
Installation of the Cabin Pressure 406 ALL
Controller (11HL, 12HL)
VALVE - OUTFLOW 21-31-51
REMOVAL/INSTALLATION 401 ALL Removal of the Outflow Valve 10HL 401 ALL (From Inside) Installation of the Outflow Valve 418 ALL 10HL (From Inside) Removal of the Outflow Valve 10HL 436 001-049, 051-099 (From Outside) 101-105, Installation of the Outflow Valve 446 001-049, 051-099 10HL (From Outside) 101-105, Removal of the Outflow Valve 456 ALL (10HL) - Electronics Module 10HL-1 (10HL-2) Installation of the Outflow Valve 464 ALL (10HL) - Electronics Module 10HL-1 (10HL-2) Removal of the Outflow Valve 472 ALL (10HL) - Auto Motor 10HL-3 (10HL-4) Installation of the Outflow Valve 479 ALL (10HL) - Auto Motor 10HL-3 (10HL-4) Removal of the Outflow Valve 489 ALL (10HL) - Manual Motor 10HL-5 Installation of the Outflow Valve 496 ALL (10HL) - Manual Motor 10HL-5 Removal of the Outflow Valve A405 ALL (10HL) - Feedback Assembly 10HL-6
21-CONTENTS Page 19 Aug 01/05 R CES
CHAPTER 21
__________
AIR CONDITIONING
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Installation of the Outflow Valve A412 ALL (10HL) - Feedback Assembly 10HL-6
VALVE - SAFETY 21-31-52
SERVICING 301 ALL
Scheduled Replacement of the 301 ALL
Safety Valve Filter
VALVE - SAFETY 21-31-52
REMOVAL/INSTALLATION 401 ALL
Removal of the Safety Valve 6HL 401 ALL
(7HL)
Installation of the Safety Valve 405 ALL
6HL (7HL)
HEATING 21-40-00
_______ DESCRIPTION AND OPERATION 1 ALL General 1 ALL Aft Cargo-Compartment Heating 1 ALL
CARGO COMPARTMENT HEATING 21-43-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Aft Cargo-Compartment Heating 1 ALL Component Location 1 ALL System Description 14 ALL Power Supply 19 ALL Component Description 23 ALL Temperature Sensors 23 001-049, 051-099 101-105, 151-199 201-213, Temperature Sensors 23 ALL Temperature Selector 23 ALL Trim-Air Valve 26 ALL Heating Controller 26 ALL Pressure Regulating-Valve 26 ALL Operation/Control and Indicating 31 ALL AFT Cargo-Compartment 31 ALL Temperature-Selector Hot-Air Switch 32 ALL BITE Test 32 ALL CHC Power-up Test 32 ALL CFDS Maintenance Messages 33 ALL
CARGO COMPARTMENT HEATING 21-43-00
DEACTIVATION/REACTIVATION 401 ALL
Deactivation of the AFT Cargo 401 ALL
21-CONTENTS Page 20 Aug 01/05 R CES 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(46)