 1. Reason for the Job
__________________
 To decontaminate the ECS if oil has gone into it from one or both engines.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific lint-free cloth No specific protective covers No specific Special blanking caps - locally manufactured - see
 Job Set-up No specific Temperature simulating devices - locally manufactured
 -see Job Set-up
 1EFF : ALL 1 21-00-00Page 299 1 1 Aug 01/05R 1 1 1CES 1


 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-001K  USA AMS 1526 EXT.CLEANING CONCENTRATE (Ref. 20-31-00)
 Material No. 11-002  USA MIL-PRF-680 DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT) (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001  Pre-conditioning through the HP Ground Connection
 12-33-21-618-001  Pre-conditioning with the APU
 21-00-00-100-001  Cleaning of Special Components in the Environmental
 Control System (ECS)
 21-00-00-615-003  Decontamination of the Environmental Control System
 (ECS) when the Temperature is below 24 deg.C
 (Engine/s)
 21-21-00-710-001  Operational Test of the Cabin Recirculation Fans 14HG
 and 15HG.
 21-21-41-000-001  Removal of the Recirculation Filter 4012HM (4013HM)
 21-21-41-400-001  Installation of the Recirculation Filter 4012HM
 (4013HM)
 21-21-51-000-001  Removal of the Cabin Recirculation Fans 15HG and 14HG
 21-21-51-400-001  Installation of the Cabin Recirculation Fans 15HG and
 14HG
 21-43-00-710-003  Operational Test of the AFT Cargo Compartment Heating
 System
 21-43-51-000-001  Removal of the Aft Cargo-Trim Air-Valve (12HC)
 21-43-51-400-001  Installation of the Aft Cargo-Trim Air-Valve (12HC)
 21-43-52-000-001  Removal of the Pressure Regulating Valve - Aft
 Cargo-Compartment Heating
 21-43-52-400-001  Installation of the Pressure Regulating Valve - Aft
 Cargo-Compartment Heating
 21-51-41-000-001  Removal of the Ozone Filter (Converter) 100HM (101HM)
 21-51-41-400-001  Installation of the Ozone Filter 100HM (101HM)
 21-51-51-000-001  Removal of the Pack Flow-Control Valve
 21-51-51-400-001  Installation of the Pack Flow-Control Valve
 21-52-16-000-001  Removal of the Water Extractor 10HM8 (11HM8)
 21-52-16-400-001  Installation of the Water Extractor 10HM8 (11HM8)

 1EFF : ALL 1 21-00-00Page A200 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-21-000-001  Removal of the Air Cycle Machine 10HM1 (11HM1)
 21-52-21-400-001  Installation of the Air Cycle Machine 10HM1 (11HM1)
 21-52-32-000-001  Removal of the Condenser 10HM2 (11HM2)
 21-52-32-400-001  Installation of the Condenser 10HM2 (11HM2)
 21-52-42-000-001  Removal of the Water Injector 20HM (21HM)
 21-52-42-400-001  Installation of the Water Injector 20HM (21HM)
 21-52-43-400-001  Installation of the Pack Downstream Check-Valves 15HM
 and 16HM
 21-63-00-710-004  Operational Test of the Cockpit and Cabin Temperature
 Control with CFDS/MCDU
 21-63-17-000-001  Removal of the Temperature Sensors (21HK, 22HK, 23HK)
 21-63-17-400-001  Installation of the Temperature Sensors (21HK, 22HK,
 23HK)
 24-41-00-861-002  Energize the Aircraft Electrical Circuits from the
 External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 31-60-00-860-001  EIS Start Procedure
 31-60-00-860-002  EIS Stop Procedure
 36-11-49-000-042  Removal of the Pylon Interface Duct
 