20-28-00-912-004  Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
21-61-00-710-001 Operational Test of the Pack Temperature-Control System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65 25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
 FR65 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-23-51-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 21-23-51-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that:
 (a)
 The aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).

 (b)
 The AFT cargo-compartment door 826 is open (Ref. TASK 52-30-00-860-001).

 (c)
 The access platform is in position at the AFT cargo-compartment door 826.


 (d) The access panel 162DW is removed (Ref. TASK 25-55-12-000-001). Subtask 21-23-51-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL 5HU U21 122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY 6HU U19
 1EFF : ALL 1 21-23-51Page 406 1 1 May 01/05R 1 1 1CES 1


 4. Procedure_________
 (Ref. Fig. 401/TASK 21-23-51-991-001)
 Subtask 21-23-51-420-050
 A. Installation of the Lavatory and Galley Extract Fan 
R R  (1) Remove the blanking plugs from the lavatory and galley extract fan (3) and from the duct (11). 
R R  (2) Put the lavatory and galley extract fan (3) in position on the duct (11) and in the bracket (13).
R R  NOTE : Make sure that the flow arrow on the body of the lavatory and____ galley extract fan (3) points in the direction of the air flow. 
R  (3) Install the clamps (2) and (4).
 NOTE : Make sure that when you look in the direction of the air flow____ the electrical connector on the lavatory and galley extract fan is between the 4 o'clock and the 5 o'clock position. 
R  (4) Make sure that the clamp (4) is in the correct position. 
R  (5) TORQUE the clamp (4) to between 0.25 and 0.30 m.daN (22.12 and 26.54 lbf.in). 
R  (6) Make sure that the clamp (2) is in the correct position. 
R  (7) TORQUE the clamp (2) to between 0.13 and 0.18 m.daN (11.50 and 15.92 lbf.in). 
R R  (8) Put the outlet duct (12) in position on the lavatory and galley extract fan (3) and install the clamp (1). 
R R  NOTE : Make sure that the location pin (14) is engaged in the hole in____ the lavatory and galley extract fan outlet-flange. 
R  (9) Make sure that the clamp (1) is in the correct position. 
R  (10) TORQUE the clamp (1) to between 0.2 and 0.25 m.daN (17.69 and 22.12 lbf.in).

 

R (11) Put the bonding strap (8) in position and install the washer (9), the R screw (10), the washer (7) and the nut (6) (Ref. TASK 20-28-00-912-004).
 (12)
 Remove the blanking caps from the disconnected electrical connectors.

 (13)
 Make sure that the electrical connectors are clean and in the correct condition.


R (14) Connect the electrical connector (5).
 (15) Make sure that the work area is clean and clear of tool(s) and other items.
 Subtask 21-23-51-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5HU, 6HU
 Subtask 21-23-51-710-050
 C. Do the operational test of the pack temperature-control system (Ref. TASK 21-61-00-710-001)
 5. Close-up
________
 Subtask 21-23-51-410-050

 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel 162DW (Ref. TASK 25-55-12-400-001).

 (3)
 Remove the access platform.

 (4)
 Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(142)