• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (2) Malfunction Detection OVERHEAT thermo-switches operate if the stator temperature of the recirculation fans 14HG (15HG) goes up to 160 DEG.C (320.00 DEG.F) +/- 8 DEG.C (46.40 DEG.F). They will remove the ground from the power relays 5HG (6HG), the fans will stop and the fan fault relays 10HG (9HG) will open. The fan fault relays signal the Centralized Fault Display System (CFDS) and the Electronic Centralized Aircraft Monitoring (ECAM) system. To start the cabin fans again you must push the CAB FANS switch twice, once to switch OFF and once to switch ON. You must find and repair the fault before you do this.
 **ON A/C 301-399,
 (2) Malfunction Detection OVERHEAT thermo-switches operate if the stator temperature of the recirculation fans 14HG (15HG) goes up to 180 DEG.C (356.00 DEG.F) +/- 8 DEG.C (46.40 DEG.F). They will remove the ground from the power relays 5HG (6HG), the fans will stop and the fan fault relays 10HG (9HG) will open. The fan fault relays signal the Centralized Fault Display System (CFDS) and the Electronic Centralized Aircraft Monitoring (ECAM) system. To start the cabin fans again you must push the CAB FANS switch twice, once to switch OFF and once to switch ON. You must find and repair the fault before you do this.


 Controls and Indications Figure 007
 1EFF : 1 1R 1CES  ALL  1 11 1 21-21-00 Page 16 Feb 01/05

 

 **ON A/C ALL
 B. Controls and Indications If a recirculation fan fails, the recirculation fan control circuit transmits signals to the Centralized Fault Display System (CFDS) and to the Electronic Centralized Aircraft Monitoring (ECAM) for display after flight. The ECAM will give an immediate display only if both fans fail.


 AIR DISTRIBUTION AND RECIRCULATION - ADJUSTMENT/TEST
____________________________________________________ TASK 21-21-00-710-001 Operational Test of the Cabin Recirculation Fans 14HG and 15HG.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-002 Procedure to Get Access to the SYSTEM REPORT/TEST/AIR COND Page
 3. Job Set-up
__________ Subtask 21-21-00-861-052
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). NOTE : The energization of the aircraft electrical circuits starts a full
____ test of the pack, cockpit and cabin temperature-control systems.
 1EFF : ALL 1 21-21-00Page 501 1 1 May 01/05R 1 1 1CES 1


 Subtask 21-21-00-865-056
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  4HK 3HK 2HK 1HK 21HH 23HH 1HH 3HH 24HH 22HH  V20V19V18V17W22W21X22X21Y21Y20 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18 
R  **ON A/C ALL 
R R R R  122VU AIR COND/RECIRC FAN/R/CTL 122VU AIR COND/RECIRC FAN/R/SPLY 122VU AIR COND/RECIRC FAN/L/CTL 122VU AIR COND/RECIRC FAN/L/SPLY  11HG 3HG 2HG 1HG  W20 W18 X20 X18

 

 -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(119)