1EFF : ALL 1 21-00-00Page 236 1 1 Aug 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
CMM 215110
CMM 215202
CMM 215204
CMM 215234
21-00-00-991-004 Fig. 201
**ON A/C 001-049, 101-105, 151-199,
21-00-00-991-001-A Fig. 202
R **ON A/C 051-099, 106-149, 201-299, 301-399,
21-00-00-991-001 Fig. 202A
R **ON A/C 401-499,
21-00-00-991-001-B Fig. 202B
**ON A/C ALL
21-00-00-991-002 Fig. 203
3. Job Set-up
__________
Subtask 21-00-00-941-051
A. Necessary Special Tools
(1)
Special blanking caps - locally manufactured - see Job Set-up 2 off. These are to be locally manufactured, refer to (Ref. Fig. 201/TASK 21-00-00-991-004) and to SIL 21-029.
(2)
Temperature simulating devices - locally manufactured - see Job Set-up 3 off. These are to be locally manufactured, refer to schematic in (Ref. Fig. 203/TASK 21-00-00-991-002) and to SIL 21-029.
Temperature Simulating Device - Schematic Figure 203/TASK 21-00-00-991-002
1EFF : 1 1R 1CES ALL 1 11 1 21-00-00 Page 238 Aug 01/05
Subtask 21-00-00-861-051
B. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-00-00-860-058
C. Aircraft Maintenance Configuration
(1)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(2)
On the ECAM control panel push the COND pushbutton switch.
(3)
Make sure that at least one of the CKPT, the FWD cabin or the AFT cabin temperatures shown on the ECAM lower display unit (DU) is more than 24 deg. C.
(4)
If none of the temperatures is more than 24 deg. C you must do the alternative ECS decontamination procedure (Ref. TASK 21-00-00-615-001).
Subtask 21-00-00-865-060
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/ENG 1/MONG 2HA1 D11 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22
Subtask 21-00-00-010-051
E. Remove the access panels 191BB, 192FB, 191KB and 192KB (Ref. TASK 53-35-13-000-002).
4. Procedure
_________ **ON A/C 001-049, 101-105, 151-199,
(Ref. Fig. 202/TASK 21-00-00-991-001-A)
1EFF : ALL 1 21-00-00Page 239 1 1 Aug 01/05R 1 1 1CES 1
R **ON A/C 051-099, 106-149, 201-299, 301-399,
(Ref. Fig. 202A/TASK 21-00-00-991-001)
R **ON A/C 401-499,
(Ref. Fig. 202B/TASK 21-00-00-991-001-B)
**ON A/C ALL
Subtask 21-00-00-869-061
A. Cleaning of the APU Bleed Air Duct forward of the Load Control Valve
WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING
_______ SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
(1)
Put a warning notice in position in the cockpit to tell persons not to start the APU or the engines.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 1(71)