时间:2011-02-24 09:22来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_
 3 Install the condensers (Ref. TASK 21-52-32-400-001).

_ R **ON A/C 051-099, 106-149, 201-299, 301-399, 401-499,
 Subtask 21-00-00-160-062
 A. Special Cleaning of ECS Components
 (1) As necessary:
 (a) Clean the Reheaters 10HM3 and 11HM3 1 Remove the reheaters (Ref. TASK 21-52-31-000-001).
_
 2 Clean the reheaters (Ref. CMM 215208).

_
 3 Install the reheaters (Ref. TASK 21-52-31-400-001).

_

 (b) Clean the Primary Heat Exchangers 10HM6 and 11HM6 1 Remove the primary heat exchangers (Ref. TASK 21-52-25-000-
_
 001). 2 Clean the primary heat exchangers (Ref. CMM 215211).
_ 3 Install the primary heat exchangers (Ref. TASK 21-52-25-400-
_ 001).
 (c) Clean the Main Heat exchangers 10HM7 and 11HM7 1 Remove the main heat exchangers (Ref. TASK 21-52-26-000-001).
_
 2 Clean the main heat exchangers (Ref. CMM 215212).

_
 3 Install the main heat exchangers (Ref. TASK 21-52-26-400-001).

_

 (d) Clean the Condensors 10HM2 and 11HM2 1 Remove the condensers (Ref. TASK 21-52-32-000-001).
_
R 1EFF : ALL 1 21-00-00Page A243 1 1 Aug 01/05 1 1 1CES 1


 2 Clean the condensers (Ref. CMM 215210).

_
 3 Install the condensers (Ref. TASK 21-52-32-400-001).

_ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-00-00-110-052
 B. Cleaning of ECS Components
 (1) As necessary:
 (a) At the anti-ice valves 17HH and 37HH: 1 Remove the sense lines (Ref. TASK 21-61-41-000-002).
_
 2 Cleaning of the Sense Lines

_ WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 -Clean the sense lines with CLEANING AGENTS (Material No. 11-001K).
 3 Install the sense lines (Ref. TASK 21-61-41-400-002).
_
 (b) At the air conditioning packs 10HM and 11HM: 1 Remove the pipe assemblies (Ref. TASK 21-52-23-000-001).
_ 2 Cleaning of the Pipe Assemblies
_ WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 -Clean the pipe assemblies with a lint free cloth and CLEANING AGENTS (Material No. 11-001K) .
 3 Install the pipe assemblies (Ref. TASK 21-52-23-400-001).
_R **ON A/C 401-499,

 

 Subtask 21-00-00-110-052-A
 B. Cleaning of ECS Components
 (1) As necessary:
 (a) At the air conditioning packs 10HM and 11HM: 1 Remove the pipe assemblies (Ref. TASK 21-52-23-000-001).
_ 2 Cleaning of the Pipe Assemblies
_ WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 -Clean the pipe assemblies with a lint free cloth and CLEANING AGENTS (Material No. 11-001K) .
 3 Install the pipe assemblies (Ref. TASK 21-52-23-400-001).
_
 **ON A/C ALL

 Subtask 21-00-00-160-063
 C. Special Cleaning of ECS Components
 (1) As necessary:
 (a) In the pack downstream system: 1 Remove the check valves 15HM and 16HM (Ref. TASK 21-52-43-000-
_
 001).

 2 Cleaning of the Check Valves
_ WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 -clean the check valves with a soft-bristle brush and CLEANING AGENTS (Material No. 11-001K).


 - dry the check valves thouroughly with a lint free cloth or
 with dry compressed air.
 3_ Install the check valves 15HM and 16HM (Ref. TASK 21-52-43-
400-001).

 (b) In the bleed air system: 1 Remove the pressure regulating valve 14HK (Ref. TASK 21-63-52-
_
 000-001). 2 Clean the pressure regulating valve (Ref. CMM 216210).
_ 3 Install the pressure regulating valve 14HK (Ref. TASK 21-63-
_ 52-400-001).


 ECS - Component Location Figure 205/TASK 21-00-00-991-003-A
 1EFF : 001-049, 101-105, 151-199, 1 21-00-00Page A247 1 1 Aug 01/05 1 1 1CES 1


 ECS - Component Location
 Figure 205A/TASK 21-00-00-991-003

 

 ECS - Component Location
 Figure 205B/TASK 21-00-00-991-003-B
 1EFF :  401-499,  1  21-00-00 Page A249 
1  1  Aug 01/05
 1  1
 1CES  1

 

 DISTRIBUTION - DESCRIPTION AND OPERATION
________________________________________
 1. General
_______ R The distribution system delivers conditioned air to the pressurized R fuselage.
 