R 1EFF : 051-052, 1 52-31-18Page 407 1 1 May 01/05 1 1 1CES 1
R Disconnection of associated Componenets
R Figure 402A/TASK 52-31-18-991-002
R 1EFF : 051-052, 1 52-31-18 Page 408
1 1 May 01/05
1 1
1CES 1
R **ON A/C ALL
TASK 52-31-18-400-001
Installation of the Door Seal
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific No specific No specific 98D52307524000 access platform plastic spatulaTorque Wrench : range 0.20 to 3.60 m.daN (2.00 to 26.00 lbf.ft)2 SUPPORT STRUT - CARGO DOORS
R B. Consumable Materials
R R R -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 08-004 USA MIL-A-25457
R ADHESIVE SEALANT (Ref. 20-31-00)
R Material No. 08-026
R ADHESIVE/SEALANT ONE PART,RTV SILICONE RUBBER
R (Ref. 20-31-00)
R Material No. 09-013 USA MIL-PRF-81733 TYPE I CLASS A
R CORROSION INHIBITING BRUSH CONSISTENCY
R (Ref. 20-31-00)
R Material No. 11-003A
R X (Ref. 20-31-00)
1EFF : ALL 1 52-31-18Page 409 1 1 May 01/05 1 1 1CES 1
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
17 cotter pin 52-36-04 08C-080 17 cotter pin 52-36-04 08D-080
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
29-10-00-863-002 Pressurize the Yellow Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-31-11-100-001 Cleaning/Painting of the FWD Cargo-Compartment Door 52-31-11-820-004 Adjustment of the Door Opening Angle 52-31-24-400-001 Installation of the Wiring Harness 4611VB
R **ON A/C 001-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
52-31-18-991-001-A Fig. 401
**ON A/C 051-052,
52-31-18-991-001-B Fig. 401A
R **ON A/C 001-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
52-31-18-991-002-A Fig. 402
1EFF : ALL 1 52-31-18Page 410 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 051-052,
R 52-31-18-991-002 Fig. 402A
R **ON A/C ALL
3. Job Set-up
__________
Subtask 52-31-18-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
Subtask 52-31-18-860-052
B. Aircraft Maintenance Configuration
(1)
Make sure that the hydraulic reservoirs are depressurized (Ref. TASK 29-14-00-614-001).
(2)
Make sure that the Yellow hydraulic system is depressurized (Ref. TASK 29-10-00-864-002).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门4(80)