(3)
Clean the repair area with CLEANING AGENTS (Material No. 11-004) and lint-free cloth.
1EFF : ALL 1 52-31-11Page 705 1 1 Feb 01/04 1 1 1CES 1
(4)
Put masking material to the adjacent area.
(5)
Apply PRETREATMENT FOR PAINTING (Material No. 13-002) to the metal surface of the repaired area and let it dry.
(6)
Apply STRUCTURE PAINTS (Material No. 16-006) to the prepared area and let it dry.
(7)
Apply STRUCTURE PAINTS (Material No. 16-002) to the primer and let it dry.
(8)
Remove the masking material.
Subtask 52-31-11-210-056 R F. Operational Test
(1)
Operate the locking handle to make sure that the door locking mechanism of the cargo door is serviceable.
(2)
Make sure that the receptacles of the door lining attachment are serviceable.
5. Close-up
________
Subtask 52-31-11-410-055
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the door lining and insulation mats to the cargo door (Ref. TASK 52-31-13-400-001).
(3)
Install the access panel 825AR on the cargo door.
(4)
Close the FWD cargo door (Ref. TASK 52-30-00-860-002).
(5)
Remove the access platform(s).
1EFF : ALL 1 52-31-11Page 706 1 1 Feb 01/04 1 1 1CES 1 LINING AND INSULATION - REMOVAL/INSTALLATION
____________________________________________
TASK 52-31-13-000-001
Removal of the Lining and the Insulation
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,
52-31-13-991-001 Fig. 401 R **ON A/C 106-149, 221-299, 301-399, 401-499,
52-31-13-991-001-A Fig. 401A
1EFF : ALL 1 52-31-13Page 401 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
3. Job Set-up
__________
Subtask 52-31-13-010-050
A. Get Access
(1) Open the FWD and/or AFT cargo-compartment door(s) (referred to as cargo door(s)) and install the actuator safety locks. (Ref. TASK 52-30-00-860-001).
(2) Put the access platform in position.
Subtask 52-31-13-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,
(Ref. Fig. 401/TASK 52-31-13-991-001) R **ON A/C 106-149, 221-299, 301-399, 401-499,
(Ref. Fig. 401A/TASK 52-31-13-991-001-A)
1EFF : ALL 1 52-31-13Page 402 1 1 Aug 01/05 1 1 1CES 1
Lining and Insulation
Figure 401/TASK 52-31-13-991-001
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 52-31-13Page 403 1201-220, 1May 01/05 1 1 1CES 1
Lining and Insulation Figure 401A/TASK 52-31-13-991-001-A
R 1EFF : 106-149, 221-299, 301-399, 401-499, 1 52-31-13Page 404 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL
Subtask 52-31-13-020-050
A. Removal of the Protective Lining
(1)
Release the quick-release fasteners (2) to disconnect the protective lining (3) from the cargo door (1).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门4(77)