• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 23:54来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the cargo door frame FR27A:
R - install the rigging pin R 98D52307525200 into the rigging R hole of the door frame and the R shaft lever bolt.
2. On each frame of the cargo door:
R - install the rigging pin R 98D52307525200 into the rigging R hole of each door frame and the R bellcrank bolt.
-make sure that the rigging pins are removed.
3. On the cargo door:
-pull the door handle away in the UNLOCKED direction and measure the force necessary
R with a SPRING BALANCE 20 DAN R (48 LBF).
-turn the latching handle up to the fully UNLOCKED position and measure the force necessary
R with a SPRING BALANCE 20 DAN R (48 LBF).
4. On the control panel: On the cargo door frame FR27A:
-
the rigging pin must engage in the rigging hole of the shaft lever bolt if the upper dead center is correctly adjusted.

On each frame of the cargo door:

-
the rigging pin must engage in the rigging hole of the bellcrank bolt if the lower dead center is correctly adjusted.


-each latching unit is free andmovable.
On the cargo door:
-
the locking cams of the locking shaftrelease the latching hooks and thevent door opens.

-
the force must be less than 18 daN (40.4656 lbf).

-
the latching hooks disengage from thelatch fittings and the cargo doormoves in the open direction.

-
the force must be less than 18 daN (40.4656 lbf).


On the cargo door:
 1EFF : 001-049, 053-061, 101-105, 201-203, 1 52-31-00Page 522 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
- set the selector to the CLOSE position and hold it. 
5. On the cargo door: 
R R R  - move the latching handle down to the LOCKED position and measure the force necessary with a SPRING BALANCE 20 DAN (48 LBF) 
R R  - push the door handle in the recess of the door structure and measure the force necessary with a SPRING BALANCE 20 DAN (48 LBF). 

-
the cargo door actuators retract andclose the cargo door.

On the cargo door:

-
the locking hooks engage with thelock fittings and lock the cargo door in the closed position.

-
the force must be less than 18 daN (40.4656 lbf).

-
the vent door closes,

-
the lock of the cams block thelatching hooks,

-
the door handle is locked.

-
the force must be less than 18 daN (40.4656 lbf).


R  (5) Install the access panel 825AR.
 **ON A/C 051-052,
 Subtask 52-31-00-720-056
 B. Test of the Locking Mechanism (Ref. Fig. 502A/TASK 52-31-00-991-002)
 (1) Make sure that the cargo door is correctly closed and locked (Ref. TASK 52-30-00-860-002).
 (2) Remove the access panel 825AR to get access to the cargo door mechanism.
R  (3) Remove the handle flap mechanism to get access to the applicable rigging holes (Ref. TASK 52-31-21-000-002). 
R  (4) If necessary, adjust the locking mechanism (Ref. TASK 52-31-11-820-002).

 1EFF : 001-049, 051-061, 101-105, 201-203, 1 52-31-00Page 523 1 1 Aug 01/05 1 1 1CES 1


R  Dead Center of the Locking Mechanism 
R  Figure 502A/TASK 52-31-00-991-002 
R 1EFF :  051-052,  1  52-31-00 Page 524 
1  1  May 01/05
 1  1
 1CES  1

 

R (5) Do this test:
R NOTE : The rigging pins 98D52307525100 and 98D52307525200 are part of
____ R the ADJUSTMENT TOOL - CARGO DOORS (98D52307525000).
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On each frame of the cargo door: R - install the rigging pin R 98D52307525200 into the rigging R hole below the locking shaft to R examine the upper dead center.
R - install the rigging pin R 98D52307525100 in the rigging R hole behind the safety shaft to
examine the lower dead center.
 -make sure that the rigging pins are removed from the last frame.
 2. On the cargo door:
-pull the locking handle away from the recess of the handle flap and measure the force
R necessary with a SPRING BALANCE R 20 DAN (48 LBF).
-turn the locking handle down to the UNLOCKED position and measure the force necessary
R with a SPRING BALANCE 20 DAN R (48 LBF).
3. On the control panel:
-set the selector to the CLOSE position and hold it.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门4(37)