• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 23:54来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Carefully disengage the VELCRO tapes and remove the protective lining


 (3) together with the self-adhesive insulation from the cargo door (1).
 1EFF : ALL 1 52-31-13Page 405 1 1 Aug 01/04 1 1 1CES 1


 TASK 52-31-13-400-001
 Installation of the Lining and the Insulation

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,
 52-31-13-991-001 Fig. 401 R **ON A/C 106-149, 221-299, 301-399, 401-499,
 52-31-13-991-001-A Fig. 401A
 1EFF : ALL 1 52-31-13Page 406 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 3. Job Set-up
__________
 Subtask 52-31-13-865-051

 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 52-31-13-860-052
 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the FWD and/or AFT cargo-compartment door(s) (referred to as cargo door(s)) are opened and the actuator safety locks are installed (Ref. TASK 52-30-00-860-001).

 (2)
 Make sure that the access platform in position below the opened cargo door.


 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,

 (Ref. Fig. 401/TASK 52-31-13-991-001) R **ON A/C 106-149, 221-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 52-31-13-991-001-A)
 1EFF : ALL 1 52-31-13Page 407 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL


 Subtask 52-31-13-420-050
 A. Installation of the Protective Lining
 (1)
 Put the protective lining (3) with the self-adhesive insulation mat in position at the cargo door (1) and engage the VELCRO tapes.

 (2)
 Attach the protective lining (3) with the quick-release fasteners (2) to the cargo door (1).


 5. Close-up
________
 Subtask 52-31-13-865-052

 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1MJ, 3801GX, 3802GX, 3803GX
 Subtask 52-31-13-410-050
 B. Close Access
 (1)
 Remove the actuator safety locks and close the FWD and/or AFT cargo-compartment door(s) (Ref. TASK 52-30-00-860-002).

 (2)
 Remove the access platform(s).


 1EFF : ALL 1 52-31-13Page 408 1 1 Aug 01/04 1 1 1CES 1 SEAL - DOOR - REMOVAL/INSTALLATION


__________________________________
 TASK 52-31-18-000-001
 Removal of the Door Seal
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform
 No specific circuit breaker(s) safety clip(s)
 98D52307524000 1 SUPPORT STRUT - CARGO DOORS

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门4(78)