Subtask 49-10-00-865-057
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
5. Close-up
________ Subtask 49-10-00-860-070
A. Not Applicable
TASK 49-10-00-440-003
Reactivation of the APU (4005KM) (GTCP 36-300)
1. Reason for the Job
__________________
Refer to the MMEL TASK: 49-10-01
Power Plant - APU
(FAA Only)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-00-00-710-004 Operational Test of the APU (4005KM) (GTCP 36-300) TSM 49 (for corrective action)
3. Job Set-up
__________ Subtask 49-10-00-860-062
A. Not Applicable
4. Procedure
_________ Subtask 49-10-00-440-053
A. Reactivation of the APU
(1)
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
(2)
Remove the warning placard 'APU INOP' which is in position on the panel 25VU on/adjacent to the APU MASTER SW pushbutton switch.
(3)
Do the trouble shooting as per (Ref. TSM 49).
Subtask 49-10-00-710-052
B. Test
(1)
Do the operational test of the APU (Ref. TASK 49-00-00-710-004).
(2)
Delete the entry in the applicable log book which tells people that the APU does not operate.
5. Close-up
________ Subtask 49-10-00-860-071
A. Not Applicable
POWER PLANT - DEACTIVATION/REACTIVATION
_______________________________________ TASK 49-10-00-040-004 Deactivation of the APU (4005KM) (131-9(A))
1. Reason for the Job
__________________
Refer to the MMEL TASK: 49-10-01
Power Plant - APU
(FAA Only)
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific warning placard 'APU INOP'
3. Job Set-up
__________ Subtask 49-10-00-860-065
A. Not Applicable
4. Procedure
_________ Subtask 49-10-00-040-055
A. Deactivation of the APU
(1)
On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is in the off position.
(2)
Put the warning placard 'APU INOP' in position on the panel 25VU on/adjacent to the APU MASTER SW pushbutton switch.
R EFF : 001-049, 101-105, 107-107, 151-199, 49-10-00Page 401 201-210, Config-2 Aug 01/05
CES Subtask 49-10-00-865-059
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
5. Close-up
________ Subtask 49-10-00-860-066
A. Not Applicable
R EFF : 001-049, 101-105, 107-107, 151-199, 49-10-00Page 402 201-210, Config-2 Aug 01/05
CES
TASK 49-10-00-440-004
Reactivation of the APU (4005KM) (131-9(A))
1. Reason for the Job
__________________
Refer to the MMEL TASK: 49-10-01
Power Plant - APU
(FAA Only)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-00-00-710-008 Operational Test of the APU (APS 3200) TSM 49 (for corrective action)
3. Job Set-up
__________ Subtask 49-10-00-860-067
A. Not Applicable
4. Procedure
_________ Subtask 49-10-00-440-054