Corrected PT (Table A) = (PT x (1.0132/Barometer)) + PT(CORR) (Table A Value = (AIDS Value x (1.0132/Barometer(bar)) + Value T4)
NOTE : For the Value T4 ==>
____ (Ref. Fig. 504/TASK 49-00-00-991-004)
(d) MES Mode EGTA and PT Correction Formula EGTA(Table A) = EGTA + EGT(GLA) + EGT(LCIT) - EGT(IGV) (Table A Value = ECAM Value + Value T2 + Value T5 - Value T8)
NOTE : For the Value T2 ==>
____ (Ref. Fig. 502/TASK 49-00-00-991-002) For the Value T5 ==> (Ref. Fig. 505/TASK 49-00-00-991-005) For the Value T8 ==> (Ref. Fig. 508/TASK 49-00-00-991-011)
(Corrected PT (Table A) = (PT x (1.0132/Barometer)) + PT(CORR) - PT(IGV) (Table A Value = (AIDS Value x (1.0132/Barometer(bar)) + Value T5 - Value T8)
NOTE : For the Value T5 ==>
____ (Ref. Fig. 505/TASK 49-00-00-991-005) For the Value T8 ==> (Ref. Fig. 508/TASK 49-00-00-991-011)
5. Close-up
________
Subtask 49-00-00-860-084
A. Put the aircraft back to its initial configuration.
(1)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(2)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
TASK 49-00-00-790-001
Check APU Compartment and Air Intake Duct for Oil Contamination (GTCP 36-300)
1. Reason for the Job
__________________
Refer to the MPD TASK: 499100-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific black light No specific bright light source No specific circuit breaker(s) safety clip(s) No specific degreaser No specific steam cleaner No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 49-00-00-860-003 APU Start by External Power (GTCP 36-300) 49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 21-00-00-615-001 Decontamination of the Environmental Control System
(ECS) when the Temperature is below 24 deg.C (APU) (for corrective action)
21-00-00-615-002 Decontamination of the Environmental Control System (ECS) when the Temperature is above 24 deg.C (APU) (for corrective action)
-------------------------------------------------------------------------------
REFERENCE DESIGNATION ------------------------------------------------------------------------------- -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-23-51-000-001 Removal of the APU Generator 8XS (for corrective
action)
24-23-51-400-001 Installation of the APU Generator 8XS (for corrective
action)
49-11-11-000-001 Removal of the Auxiliary Power Unit (APU) - 4005KM
(GTCP 36-300) (for corrective action)
49-11-11-400-001 Installation of the Auxiliary Power Unit (APU) -
4005KM (GTCP 36-300) (for corrective action)
49-16-00-100-001 Cleaning of the APU Air Intake System (GTCP 36-300)
(for corrective action)
49-16-00-210-001 Detailed Inspection of the Air Intake, Diffuser
Elbow, Seals and Felt Metal (GTCP 36-300) (for
corrective action)
49-16-45-000-001 Removal of the Air Intake Diffuser and Elbow (GTCP
36-300) (for corrective action)
49-16-45-400-001 Installation of the Air Intake Diffuser and Elbow
(GTCP 36-300) (for corrective action)
49-17-41-400-001 Installation of the Drain Tank (GTCP 36-300) (for
corrective action)
49-26-53-000-001 Removal of the Regulating Gearbox Valve (8016KM)
(GTCP 36-300) (for corrective action)
49-26-53-400-001 Installation of the Regulating Gearbox Valve (8016KM)