Subtask 49-00-00-865-128
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-00-00-860-119
 C. Aircraft Maintenance Configuration
 (1)
 On C/B panel 121VU, pull the circuit breaker AIDS/DMU 4TV (K15).
 (2)
 On the overhead panel 25VU, push the APU MASTER SW pushbutton switch (the ON legend comes on).
 (3)
 Do the procedure to get the SYSTEM/REPORT TEST item APU (Ref. TASK 31-32-00-860-001).
 4. Procedure
_________ Subtask 49-00-00-869-050
 A. Enter APU Hours and Cycles into the ECB
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the MCDU: 
-
push the line key adjacent to the APU indication.
 -
push the NEXT PAGE pushbutton switch.
 -
push the line key adjacent to the APU DATA/OIL indication.
 -
push the line key adjacent to the HOURS or START CYCLES indication.
 2. On the MCDU keyboard: 
-enter the new values of APU hours and cycles (i.e. "01152/01330"). 
3. On the MCDU: 
-push the line key adjacent to the HOURS CYCLES indication to memorize the new values.
 4. On the MCDU: On the MCDU display:
-
the APU page comes on.
-
the APU DATA/OIL page comes on.
-
the UPDATE APU DATA page comes on.
On the last line of the MCDU display(scratch-pad):
-
the entered data is shownsimultaneously.
On the MCDU display:
-
the new values of APU hours andcycles come on.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
-push the line key adjacent to
 the RETURN indication until the
 CFDS main menu comes on.
 5. Close-up
________
 Subtask 49-00-00-860-118-A
 A. Aircraft Maintenance Configuration
 (1)
 On C/B panel 121VU, push the circuit breaker AIDS/DMU 4TV (K15).
 (2)
 Do a check to verify if the DMU has updated the new APU hours and cycles. If necessary, do a manual update of the DMU data (Ref. TASK 31-36-00-740-013).
 (3)
 On the overhead panel 25VU, push the APU MASTER SW pushbutton switch (the ON legend goes off).
 Subtask 49-00-00-862-060
 B. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).
 Update of APU Hours and Cycles
 Figure 203/TASK 49-00-00-991-016
CES
 AIRBORNE AUXILIARY POWER - GENERAL ((GTCP 36-300)) - ADJUSTMENT/TEST
____________________________________________________________________
R **ON A/C 001-003, 051-099, 401-499,
 TASK 49-00-00-710-001
 Self-Test of the ECB (59KD) (GTCP 36-300)
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-001 Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page
 3. Job Set-up
__________
 Subtask 49-00-00-861-060
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002)
 Subtask 49-00-00-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER1(116)