• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:32来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Depressurize the Blue hydraulic system
 (Ref. TASK 29-10-00-864-003).


 (3)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 Subtask 27-80-00-942-054
 D. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 27-80-00Page 228 1 1 Nov 01/01R 1 1 1CES 1


 TASK 27-80-00-400-001 Installation of the Hoisting Sling WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers No specific warning notices 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER 98D27804009001 1 SLING-SLATS
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-80-00-866-004 Extending the Slats on the Ground 27-80-00-991-001 Fig. 203
 1EFF : ALL 1 27-80-00Page 229 1 1 Nov 01/01R 1 1 1CES 1


 3. Job Set-up__________
 Subtask 27-80-00-941-056
 A. Safety Precautions
 (1) Put a warning notices in position to tell persons not to operate the slat controls.
 (2) Put the safety barriers in position.
 Subtask 27-80-00-860-051
 B. Aircraft Maintenance Configuration
 (1) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866-004).
 (2) Make sure that the LOCKING TOOL - FLAP/SLAT CONTROL LEVER is installed on the slat/flap control lever on the panel 114VU.
 4. Procedure_________
 (Ref. Fig. 203/TASK 27-80-00-991-001)
 Subtask 27-80-00-480-050
 A. Installation of the Hoisting Sling 
R  (1) Remove and discard the patch (8) from the hoisting points. 
R  (2) Remove the blanking caps from the slat. 
R  (3) Remove the pip-pins (4) and the lifting lugs (5) from the hoisting sling. 
R  (4) Install the lifting lugs (5) in the slat. 
R  (5) Attach the SLING-SLATS (98D27804009001) to a hoist with a capacity of 41kg (90lb). 
R  (6) Use the hoist to position the sling over the slat. 
R  (7) Make sure that the clevis (6) is in the correct position to attach to the lifting lugs (5).

 

R  Hoisting Sling Figure 203/TASK 27-80-00-991-001
 1EFF : 1 1 1CES  ALL  1 111 27-80-00 Page 231 Aug 01/05

 

R R  (8) Lower the hoisting sling until it can be attached to the lifting lugs (5). 
R  (9) Connect the clevis (6) to the lifting lugs (5) with the pip-pins (4). 
R  (10) Put the trailing edge block (7) in position on the trailing edge of the slat. 
R R  (11) If necessary, loosen the nut (2) and adjust the turnbuckle (1) to get the correct angle to do the lift.
 5. Close-up________
 Subtask 27-80-00-942-055
 A. Removal of Equipment
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Remove the safety barriers.
 (3) Remove the warning notice(s).
 (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 

 TASK 27-80-00-000-001
 Removal of the Hoisting Sling
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______ START A TASK ON OR NEAR: - THE FLIGHT CONTROLS - THE FLIGHT CONTROL SURFACES - THE LANDING GEAR AND THE RELATED DOORS - COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵7(43)