• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:32来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R (Ref. Fig. 401/TASK 27-84-45-991-001)
 Subtask 27-84-45-865-074
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
 Subtask 27-84-45-410-054
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the applicable access panel(s):

 -
FOR 6014CM
 install 521CB, 521EB


 -
FOR 6028CM
 install 522AB, 522CB


 -
FOR 6036CM
 install 522LB, 522NB


 -
FOR 6038CM
 install 522NB, 522QB


 -
FOR 6040CM
 install 522QB, 522SB


 -
FOR 6042CM
 install 522SB


 -
FOR 6044CM
 install 522UB


 -
FOR 6064CM
 install 621CB, 621EB


 -
FOR 6078CM
 install 622AB, 622CB


 -
FOR 6086CM
 install 622LB, 622NB


 -
FOR 6088CM
 install 622NB, 622QB


 -
FOR 6090CM
 install 622QB, 622SB


 -
FOR 6092CM

 install 622SB

 -
FOR 6094CM
 install 622UB.

 

 

 

 Subtask 27-84-45-865-075
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV.
 Subtask 27-84-45-942-055
 D. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵7(142)