• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-09-06 00:29来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

sense of organization,
which translates to
increased productivity.
Javier Carbajal
Tool & Maintenance
Manager
Tremec


Lista Workbench Systems Help to Rev Up
Cellular Manufacturing At Cummins Engine.
We’re making a constant
effort to reduce process
time and address
customer needs faster,
while maintaining our
high standards for
quality. We see the Lista
system as playing a
major role in helping us
meet our day-to-day as
well as long range goals.
Terry Graue
Facilities Designer
Cummins Engine


The world’s largest producer of diesel
engines rated over 200 horsepower,
Cummins Engine Company, Inc. decided to
alter their overall manufacturing approach
and adopt a cellular philosophy. They realized
that this new methodology mandated
an investment in a new workspace system,
and turned to Lista, largely due to the Lista
workbench systems’ complete flexibility.
The Lista system provided Cummins with a
variety of storage solutions both above and
below the worksurface. Cummins purchased
200 Lista workbenches, each featuring the
Nexus system of flexible and reconfigurable
above-the-worksurface accessories. To further
boost productivity, Cummins paired
75% of their workbenches with Lista
mobile cabinets, providing technicians with
the ability to transport their necessary parts
and tools directly to a machine.
With the increasingly popular cellular manufacturing approach, technicians in
the various cells are responsible for the storage and maintenance of tools and
parts. Lista workbenches, companion mobile cabinets, and Nexus Accessory
Systems are ideally suited for cellular manufacturing. They provide individual
technicians with a built-to-order workstation that offers ready access and
increases productivity.
Lista lifetime warranty. Lista’s confidence in the quality and durability of
our materials and workmanship allows us to offer a lifetime warranty on
materials and workmanship. Please ask your Lista representative for a full
warranty statement and details.
Solutions Designed To Meet Your Needs.
Free design services. Lista's engineering and design team is ready to provide
you with a detailed plan for your individual workspace and storage
needs, free of charge. We offer solutions that are designed for maximum efficiency
and future flexibility, optimizing space and profitability.
• Floorspace utilization analysis. We can prepare plan and elevation
CAD drawings for a grouping of products, or entire room-sized solutions.
• Customized surveys and layouts. Lista experts will survey your current
and future storage and workspace needs, and propose solutions
that provide the highest density and greatest productivity.
• Integration with architectural and construction planning. Rely on
our experience with coordinating with architectural and construction professionals
at any stage of a project's development.
• Price quotes. We are happy to provide free estimates and price quotes
for any project, regardless of size.
Lista International Corp.
106 Lowland Street
Holliston, MA 01746-2094
(800) 722-3020
Fax: (508) 429-8653
www.listaintl.com
ISO 9001 Certified
© 2006 Lista International Corporation Printed in U.S.A. 03-06 30M
MAE 107:
COMPUTATIONAL METHODS
FOR ENGINEERS
Summer Session II
Sébastien MICHELIN
Mechanical & Aerospace Engineering Department
University of California, San Diego
Teaching staff
✓ Instructor: Sébastien Michelin
• Office: EBU2 Room 378
• Contact: (858)-534-1466 - smichelin@ucsd.edu
• Webpage: http://iacs5.ucsd.edu/~smicheli/
• Office hours: Mondays and Wednesdays 9a-10a or by appointment
✓ Teaching Assistants:
- Robert Krohn
• Contact: rhkrohn@ucsd.edu
• Office hours: Thursdays 10a-11a (EBU2 Room 105)
- Krishna Sriram
• Contact: ksriram@ucsd.edu
• Office hours: Tuesdays 3p-4p (EBU2 Room 305)
✓ Reader: Matthew Frey
• Contact: mbfrey@ucsd.edu
Class schedule
✓ Lectures: Mondays and Wednesdays 2p-4.50p - Center Hall Room 105
✓ Final Exam: Friday September 4, 2p-5p - Location TBD
✓ Office hours:
• Instructor: Mondays & Wednesdays - EBU2 Room 378
• TA (R. Krohn): Thursday 10a-11a - EBU2 Room 105
• TA (K. Sriram): Tuesdays 3p-4p - EBU2 Room 305
✓ Matlab & Problem Sessions:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料34(26)