RNP SAAAR - Background
On many destinations, opportunities exist in Approach, and
Missed Approach
–For Lower RNP values
–For Curved Approaches / Missed Approaches
Opportunities provided to Operators satisfying SAAAR
(Special Aircrew and Aircraft Authorization Required)
RNP RNAV or Containment Based RNAV
procedures
–Links RNAV airspace design to Aircraft Performance
2 x RNP ROC based on VEB
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 17 Implementing RNP, October 4-5 2005
RNP SAAAR - Background
RNP SAAAR benefits:
Reduce minima
More efficient and Predictable Air Traffic Management:
– De-conflicting adjacent airports
– Better access to simultaneous parallel runway or converging
runway approaches
Optimize noise abatement procedures in sensitive areas
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 18 Implementing RNP, October 4-5 2005
RNP<0.3 Single Aisle Certification
To anticipate Airbus customers’ needs:
Target RNP 0.1
A318, A319, A320 have been certified for RNP
as low as 0.15 with Honeywell FMS 2
Demonstrations are in progress for other
aircraft types and/or FMS vendors
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 19 Implementing RNP, October 4-5 2005
RNP SAAAR constraints
RNP SAAAR constraints:
Operational evaluation of each instrument procedure
Special flight crew training
Specific operational approval
National Authorities need to approve FAA SAAAR
criteria or develop their own criteria
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 20 Implementing RNP, October 4-5 2005
RNP SAAAR Project
AIRBUS
RNAV-RNP< 0.3
Certification with
EASA/FAA
AIRLINE
Operational Approval
with the support of
Airbus and the
Procedure
Designer
Approach Procedure
Designer
• Aircraft performance
• Fly-ability checks
• Flight crew procedures
• Crew training
• Documentation
• Approach design
• Approach charts
• Nav. Database coding
• Nav. Database integrity
• Procedure maintenance
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 21 Implementing RNP, October 4-5 2005
Operator validation
and
Navigation Database Validation
Procedure design
Approved Suppliers
Approved Suppliers
crew check
Charts
FMS
Data Supplier ARINC 424 “master” file
FMS Database Processing Packed Data
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 22 Implementing RNP, October 4-5 2005
RNP SAAAR - Airbus Deliverables
RNP 0.3 SAAAR Capability and Operational
Compliance Document, or the Airworthiness
Compliance Document for RNP<0.3
Aims to be used by Operators to support operational
approval
Provides all relevant information for safe operation of RNP
SAAAR
Summarizes:
– Airworthiness Assessment
– Assumptions & Limitations that should be considered in the
operational evaluation
– Assumptions & Limitations that should be considered for the
instrument approach procedure design
International Standardisation
Current Situation and Perspectives
© AIRBUS 2005 S.A.S. All rights reserved. Confidential and proprietary document.
Airbus RNP Operations 24 Implementing RNP, October 4-5 2005
International standardisation - Current situation and perspectives
Instrument procedures design criteria:
ICAO RNP RNAV Procedure (PANS OPS) available for
RNP 0.3
- ICAO RNP SORSG meetings:
Objective : to standardize a new approach type for RNP < 0.3
Aircraft airworthiness and operational requirements:
EASA (European Aviation Safety Agency) aims at
standardisation across European countries and
harmonization with FAA
- AMC20-XZ in progress
AIRBUS intent is to be compliant with AMC 20 XZ